17
2.1 Stripe Hog System Introduction
The SH8000 waterblasting system is mounted
to the truck chassis and powered by the truck
engine through a special power take off. The
waterblasting system includes an Ultra-high pres-
sure water system, vacuum system, water and
debris tanks, hydraulic system, hydrostatic drive
system and DC electrical system.
Most components are controlled by switches in a
cab mounted control switch panel, Joystick console
and PLC screen. Others are controlled by switches
or switch panels located on the chassis near the
component controlled by the switch or switches.
The operation and maintenance requirements for
the engine, drive train and chassis components
are unique to the manufacturer and the selected
options. Each truck chassis manufacturer provides
owners information manuals with their product.
It is important that you read the manuals care-
fully and become familiar with the proper care
and operation of engine, drive system, chassis,
safety equipment and all components of your
truck chassis.
2.2 Ultra-high Pressure Water System
Each manufacturer of the high pressure
waterblasting system components provides an
information and operating manual with its prod-
uct. It is extremely important that you read the
manuals and become familiar with the proper care
and operation of the components before operating
the waterblasting system.
WARNING
HIGH PRESSuRE WATER FROM SPRAY JETS OR RuPTuRED
HOSES CAN CAuSE SEvERE INJuRY OR EvEN DEATH.
ALWAYS BE SuRE WORK AREA IS CLEAR OF PEOPLE,
HANDS, FEET, ETC., BEFORE ENGAGING THE 40K CLuTCH
SWITCH TO ACTIvATE THE uLTRA-HIGH PRESSuRE
SYSTEM.
Section 2:
Stripe Hog Systems
Summary of Contents for Stripe Hog SH8000
Page 1: ...Operations Manual...
Page 2: ...2...
Page 6: ...6 NOTES...
Page 16: ...16 NOTES...
Page 80: ...80 NOTES...
Page 166: ...166 NOTES...
Page 171: ...171 Troubleshooting UHP POWER FRAME...
Page 172: ...172 Troubleshooting...
Page 173: ...173 Appendix 2 Tools Spare Parts...
Page 174: ...174 Tools Spare Parts...
Page 175: ...175 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Page 176: ...176 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 61...
Page 179: ...179 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 64...
Page 180: ...180 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 65...
Page 181: ...181 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 66...
Page 184: ...184 NOTES...
Page 191: ......