31 of 44
NOTE:
The
1/2”
4
½”
lg.
wedge
anchor
bolts
supplied
must
have
a
minimum
embedment
of
2”
into
concrete
floor.
NOTE:
If
anchors
do
not
tighten
to
required
torque,
OR
project
more
than
2
½”
above
the
concrete
surface
due
to
floor
slope,
contact
a
foundation
engineer
to
determine
the
best
course
of
Check
fluid
level
of
lift
power
unit
and
refill
if
needed.
If
refill
was
needed,
inspect
all
fittings,
hoses
and
seals.
Tighten,
repair
or
replace
as
required.
Change
hydraulic
fluid
every
2
years.
8.9
HYDRAULIC
CYLINDER
Inspect
the
hydraulic
cylinder
mounting
to
the
runway.
Inspect
cylinder
and
hydraulic
hose
for
leaks.
Repair
or
replace
as
required.
Check
and
tighten
the
hydraulic
cylinder
rod
nuts
holding
the
cable
flange.
Inspect
bolts
holding
anti
‐
rotation
bar
onto
cable
flange
and
tighten
if
required.
(If
applicable)
Inspect
sliders
on
anti
‐
rotation
bar
for
excessive
wear
or
damage.
Replace
if
required.
(If
applicable)
Failure
to
do
so
will
lead
to
reduced
service
life,
which
could
result
in
property
damage
and/or
personal
injury.
8.10
RUNWAYS
8.10.1
CHECK
RUNWAYS
Check
level
of
runways
on
the
floor,
on
the
locks
and
on
the
cables:
Refer
to
Section
6.10
.
Adjust
as
required.
Check
runways
for
damage
or
abnormal
deformation.
If
such
conditions
exist,
contact
Snap
‐
on
Equipment
Technical
Support.
8.10.2
INSPECT
JACK
BEAM
TRACKS
Inspect
rolling
jack
/
oil
drain
pan
tracks
for
cleanliness,
corrosion,
excessive
wear
or
damage.
Clean
dirty
tracks.
Worn
or
damaged
tracks
should
be
repaired
immediately.
8.11
COLUMNS
8.11.1
CHECK
COLUMNS
Check
columns
for
corrosion,
giving
special
attention
to
the
area
at
the
base
of
the
column.
Check
severely
corroded
areas
by
pecking
with
an
awl
or
welder’s
chipping
hammer.
If
column
is
corroded
through
at
any
point,
it
must
be
replaced
immediately.
If
not
corroded
through,
remove
old
paint
and
rust
scale,
then
coat
with
a
high
quality
corrosion
resistant
paint.
Clean
and
lubricate
glide
blocks.
8.11.2
CHECK
COLUMN
ANCHORS
Check
column
anchor
bolts
for
tightness
(if
loose,
re
‐
torque
to
55
ft
‐
lb).
If
anchors
do
not
tighten
to
required
torque,
or
continue
to
loosen,
contact
Snap
‐
on
Equipment
Technical
Support.
Verify
proper
embedment
of
anchors
after
tightening.
Summary of Contents for FPA12144
Page 8: ...8 of 44 6 0 GENERAL LIFT SPECIFICATIONS Figure 1 ...
Page 12: ...12 of 44 7 3 SHEAVE INSTALLATION Figure 5 ...
Page 34: ...34 of 44 9 0 LIFT ASSEMBLY ...
Page 37: ...10 0 HYDRAULIC AND A AIR KITS AS 37 of 44 SSEMBLY ...
Page 39: ...11 0 CABLE RO OUTING DIAGRAM 39 of 44 ...
Page 42: ...13 0 POWER P PACK 6 1 1936 AB 1 42 of 44 1400 208 2 230V 1PH 60HZ ...