21 of 44
4.
When
level,
tighten
the
two
(2)
5/8”
‐
11
UNC
hex
nuts
at
the
top
of
each
safety
rack
and
the
3/8”
‐
16
UNC
1”
lg.
hex
bolts
at
the
bottom
back
of
each
post.
5.
Raise
the
lift
to
check
for
full
operating
height
of
71”.
This
measurement
is
taken
from
the
top
of
the
decks
to
the
floor.
7.10
APPROACH
RAMPS,
WHEELSTOPS,
PULLEY
COVERS
1.
Install
approach
ramps
using
ramp
pins
and
cotter
pins
provided.
Ensure
the
proper
operation
of
the
ramps.
2.
Install
front
wheel
stops
using
six
(6)
1/2”
‐
13
UNC
1”
lg.
hex
bolts
and
1/2”
lockwashers.
3.
Install
the
four
(4)
sheave
covers
over
the
sheaves
in
the
crossmember
assembly.
4.
Cycle
the
lift
several
times
to
check
proper
operation
of
the
cables,
safety
lock,
air
locks,
etc...
STOP
IMMEDIATELY
IF
THE
LIFT
IS
NOT
OPERATING
PROPERLY.
Adjust
and
recheck
for
proper
operation.
7.11
ANCHOR
INSTALLATION
The
1/2”
4
1/2”
lg.
wedge
anchor
bolts
supplied
allow
for
the
thickness
of
the
base
plates
plus
a
maximum
of
3/4”
of
shim
stock.
DO
NOT
USE
ANCHORS
SUPPLIED
IF
MORE
THAN
3/4"
INCH
OF
SHIM
STOCK
IS
USED.
Recheck
all
measurements
before
anchoring
posts.
Note:
First
anchor
the
power
post,
and
then
work
clockwise.
Using
a
1/2”
concrete
drill
bit
and
rotary
hammer
drill,
drill
through
the
concrete
floor
in
the
four
(4)
anchor
bolt
location
holes
positioned
on
the
base
of
each
post.
Summary of Contents for FPA12144
Page 8: ...8 of 44 6 0 GENERAL LIFT SPECIFICATIONS Figure 1 ...
Page 12: ...12 of 44 7 3 SHEAVE INSTALLATION Figure 5 ...
Page 34: ...34 of 44 9 0 LIFT ASSEMBLY ...
Page 37: ...10 0 HYDRAULIC AND A AIR KITS AS 37 of 44 SSEMBLY ...
Page 39: ...11 0 CABLE RO OUTING DIAGRAM 39 of 44 ...
Page 42: ...13 0 POWER P PACK 6 1 1936 AB 1 42 of 44 1400 208 2 230V 1PH 60HZ ...