24 of 44
7.13
FINAL
CHECK
OF
ASSEMBLED
LIFT
1.
Final dimension check after anchoring.
____
2.
Check for air and hydraulic leaks.
____
3.
Ensure cables are properly routed and free from obstructions.
____
4.
Ensure all safety lock mechanism are working correctly.
____
5.
Re-check level of post and decks.
____
6.
Makes sure ramps are secured correctly with cotter pins and washers. ____
7.
Check all fasteners, tighten if necessary.
____
8.
Check direction of flow control (arrow pointed toward power unit). ____
9.
If jack beams are supplied, ensure keeper bracket are installed.
____
10.
Check jam nuts on cables and safety ladders are tightened.
____
11.
Ensure cable flange clamp is installed correctly and tighten.
____
12.
Ensure cylinder shaft Jam Nuts are installed as per instructions.
____
13.
Ensure wheelstops are installed.
____
14.
Ensure wheel chocks are provided.
____
15.
Operate lift to full stroke then lower to ground while checking
____
for proper functionality.
16.
Ensure Customer Care Kit is complete and given to operator.
____
a.
Operation Manual
____
b.
ANSI / ALI Lift It Right Manual
____
c.
ANSI / ALI Safety Tip Card
____
d.
ANSI / ALI ALIS Safety Requirements for Installation
____
and Service of Automotive Lifts
e.
ANSI / ALI Quick Reference Guide
____
17.
Train end user on operation of the lift.
____
Summary of Contents for FPA12144
Page 8: ...8 of 44 6 0 GENERAL LIFT SPECIFICATIONS Figure 1 ...
Page 12: ...12 of 44 7 3 SHEAVE INSTALLATION Figure 5 ...
Page 34: ...34 of 44 9 0 LIFT ASSEMBLY ...
Page 37: ...10 0 HYDRAULIC AND A AIR KITS AS 37 of 44 SSEMBLY ...
Page 39: ...11 0 CABLE RO OUTING DIAGRAM 39 of 44 ...
Page 42: ...13 0 POWER P PACK 6 1 1936 AB 1 42 of 44 1400 208 2 230V 1PH 60HZ ...