15 of 44
7.5
POWER
PACK
INSTALLATION
Bolt
the
power
pack
to
the
mounting
bracket
on
the
front
face
of
the
left
front
post
using
four
(4)
5/16”
‐
18UNC
1”LG.
hex
head
bolts
and
four
5/16”
lockwashers.
Refer
to
Figure
7.
NOTE:
WHEN
WORKING
WITH
HYDRAULIC
LINES
AND
VALVES,
IT
IS
IMPORTANT
TO
KEEP
ALL
COMPONENTS
CLEAN
AND
FREE
OF
DIRT.
POWER
PACK
DETAILS
Figure
7
Summary of Contents for FPA12144
Page 8: ...8 of 44 6 0 GENERAL LIFT SPECIFICATIONS Figure 1 ...
Page 12: ...12 of 44 7 3 SHEAVE INSTALLATION Figure 5 ...
Page 34: ...34 of 44 9 0 LIFT ASSEMBLY ...
Page 37: ...10 0 HYDRAULIC AND A AIR KITS AS 37 of 44 SSEMBLY ...
Page 39: ...11 0 CABLE RO OUTING DIAGRAM 39 of 44 ...
Page 42: ...13 0 POWER P PACK 6 1 1936 AB 1 42 of 44 1400 208 2 230V 1PH 60HZ ...