
OM-2098C / Operation and Maintenance Manual
60CU24 / Series 500060C / 400 Hz. Generator Set
November 16, 2007
Revision 8
Chapter 1-1
Page 17
EF1 Bypass
EF2 Bypass (if applicable)
PC Board Software
Service Tool Connector
J54 Connector
Digital Control PC Board
Figure 10
(6) Engine Specific PC Board [ESB] (A1)
The ESB (see figure 12) is unique only to the engine model used in the GPU purchased. The
ESB is the primary interface between the control system and the engine’s electronic control
module. When the CTL senses the engine start button has been pressed it signals to the ESB,
which then communicates to the engine control module what mode of operation is required (idle
or rated speed).
The ESB controls the “
FREQUENCY ADJUST”
switch that is used to enable the “
FREQUENCY
ADJUST ENABLE/DISABLE”
potentiometer to test the over/under frequency fault limits of the
generator set system. The ESB also controls the
“DATA REQUEST”
button and diagnostic
indicator light to read the engine’s ECM diagnostic error codes.
Summary of Contents for 60CU24
Page 2: ......
Page 4: ......
Page 203: ...ITW GSE GROUP...
Page 204: ......
Page 205: ...ITW GSE GROUP...
Page 206: ......
Page 207: ...ITW GSE GROUP...
Page 208: ......
Page 209: ...ITW GSE GROUP...
Page 210: ......
Page 211: ...ITW GSE GROUP...
Page 212: ......
Page 213: ...ITW GSE GROUP...
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ...ITW GSE GROUP...
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......