OM-2098C / Operation and Maintenance Manual
60CU24 / Series 500060C / 400 Hz. Generator Set
April 01, 2005
Chapter 3-2
Page 6
CAUTION
Do not rotate the armature while this block is installed.
(5) Install the key in the shaft keyway.
(6) Place the bushing in the hub over the installed key, and install the coupling assembly on the
shaft, with the bushing approximately flush with the end of the shaft.
(7) Using a 3/16-inch Allen wrench, tighten the set screw in the bushing to apply pressure on the key.
(8) Refer to Figure 7. Place a straightedge across the two adjacent bushings and measure the
distance from the bushings to the mounting face of the generator fan housing. Slide the coupling
assembly on the shaft until this dimension is 1/16-inch (1.6 mm)
LESS
than the dimension
recorded in Figure 6 above. The tapered hub will be pulled onto the split bushing 1/16-inch (1.6
mm) when the 3/8-16 bolts are completely tightened.
(9) Tighten the 3/8-16 bolts alternately and evenly as follows:
a
Set a torque wrench to 30 foot-pounds (41 N-m) and tighten all three 3/8-16 bolts to that
value. Block the coupling against clockwise rotation with a bar, as illustrated in Figure 2.
Observe the
CAUTION
above when it is necessary to rotate the shaft.
b
Repeat step (a) above until 3/8-16 bolts can no longer be tightened.
c
Recheck the dimension in Figure 7 to be sure it is the same as the dimension in Figure 6.
5) Reassemble Engine and Generator
CAUTION
Use of the proper coupling bolts is very important. Failure to use the proper bolts, as
outlined below, can result in coupling failure and damage to the generator set.
a)
Insert the new coupling bolts (see Chapter 4) with lock washers through the bushings from the FAN
side of the coupling.
b)
Using a hoist, align the generator fan housing flange with the flange on the engine flywheel housing
and insert two of the attaching bolts, one on each side of the flange. Start the bolts into the tapped
holes in the flywheel housing just enough to ensure thread engagement. DO NOT TIGHTEN.
c)
Block rotation of generator and turn all of the coupling bolts into the tapped holes in the flywheel until
finger tight. DO NOT tighten with a wrench.
d)
Insert all remaining attaching bolts
(two installed in Step B, above)
through the generator flange,
engaging the tapped holes in the flywheel housing, and tighten them all securely.
e)
Torque all coupling bolts to 85 ft-lbs (115 N-m).
CAUTION
Remove all armature blocks, otherwise, damage to the armature could result.
Summary of Contents for 60CU24
Page 2: ......
Page 4: ......
Page 203: ...ITW GSE GROUP...
Page 204: ......
Page 205: ...ITW GSE GROUP...
Page 206: ......
Page 207: ...ITW GSE GROUP...
Page 208: ......
Page 209: ...ITW GSE GROUP...
Page 210: ......
Page 211: ...ITW GSE GROUP...
Page 212: ......
Page 213: ...ITW GSE GROUP...
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ...ITW GSE GROUP...
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......