6) Run-in and Periodic Check
a)
Mount the engine-generator assembly in a suitable test area and operate it for a 2-hour run-in.
b)
Shut down the engine after 2 hours and re-torque all coupling bolts to 85 foot-pounds
(115 N-m)
to
compensate for normal torque relaxation.
c)
Return the unit to normal service.
d)
After 200 hours of operation, check all coupling bolts with a torque wrench set at 85 foot-pounds
(115
N-m).
e)
Return the unit to normal service.
f)
After each additional 2,000 hours of operation
(or every year)
recheck all coupling bolts to maintain
the same torque value.
Summary of Contents for 60CU24
Page 2: ......
Page 4: ......
Page 203: ...ITW GSE GROUP...
Page 204: ......
Page 205: ...ITW GSE GROUP...
Page 206: ......
Page 207: ...ITW GSE GROUP...
Page 208: ......
Page 209: ...ITW GSE GROUP...
Page 210: ......
Page 211: ...ITW GSE GROUP...
Page 212: ......
Page 213: ...ITW GSE GROUP...
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ...ITW GSE GROUP...
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......