DAILY MAINTANANCE
I.M. HLF 1700 Eng V15-2022
137
HLF Italian Design
Push on
Change Data
key.
The following screen shot will appear:
The possible operations to do are the following:
•
Boiler Temperature:
to set the temperature of the water boiler.
•
Heating timeout water boiler
: to set the maximum heating time before the
message “Water boiler out of order” is displayed on the State Page.
•
Heating timeout steam boiler
: to set the maximum heating time before the
me
ssage “Steam boiler out of order” is displayed on the State Page.
•
Air break load up timeout:
to set the maximum time allowed to fill up the air
break before
the message “Check Water” is displayed on the State Page.
•
Water boiler load up timeout:
to set the maximum time allowed to fill up the
water boiler before the message “loading water boiler timeout” appear on the
State page.
•
Anti-Flooding:
enable or disab
le “Water Boiler load up timeout”.
•
Machine Configuration:
to set if the configuration of the external kit installed.