OPERATION
5-4
BOOM-SWING PEDAL
Use the boom swing function to efficiently operate the
machine when excavating grooves along roadsides or near
walls. The boom swing operation is performed using
boom-swing pedal (1) located at the operator’s right foot as
illustrated to the right.
Boom-Swing Operation
1. Turn cover (2) for boom-swing pedal (1) forward.
2. Step on the left side of boom-swing pedal (1) to swing
left. Step on the right side of the pedal to swing right.
3. Turn cover (2) backward over boom-swing pedal (1)
when boom-swing operation is no longer required.
3- Swing
Left
4- Swing
Right
M1MS-05-004
M1MS-05-003
M571-01-001
3
4
2
1
2
Summary of Contents for ZAXIS 17U-2
Page 1: ......
Page 7: ...CONTENTS MEMO ...
Page 9: ...MACHINE NUMBERS MEMO ...
Page 39: ...SAFETY S 30 MEMO ...
Page 41: ...SAFETY SIGNS S 32 SS4387344 SS 2901 SS3090482 SS 2869 SS3088058 SS 2870 ...
Page 42: ...SAFETY SIGNS S 33 SS4433590 SS 2871 SS4604981 SS 2872 SS4642517 SS 2873 ...
Page 45: ...SAFETY SIGNS S 36 MEMO ...
Page 53: ...OPERATOR S STATION 1 8 MEMO ...
Page 55: ...BREAK IN 2 2 MEMO ...
Page 71: ...DRIVING THE MACHINE 4 10 MEMO ...
Page 97: ...OPERATION 5 26 MEMO ...
Page 103: ...TRANSPORTING 6 6 MEMO ...
Page 116: ...MAINTENANCE 7 13 7 Swing post M1MS 07 008 ...
Page 165: ...MAINTENANCE 7 62 MEMO ...
Page 167: ...CONSUMABLE PARTS LIST 8 2 MEMO ...
Page 169: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 179: ...REFERENCE 13 2 MEMO ...
Page 183: ...INDEX 14 4 MEMO ...