MAINTENANCE
7-2
PREPARE MACHINE FOR
INSPECTION/MAINTENANCE
Before performing inspection/maintenance of the machine,
park the machine as described below unless otherwise
specified.
1. Park the machine on a solid level surface.
2. Lower the working tools such as the bucket and/or
blade to the ground.
3. Run the engine at slow idle speed without load for
approx. 5 minutes to cool down the engine.
4. Turn the key switch OFF. Remove the key from the
switch. If inspection/maintenance must be performed
with the engine running, be sure to place a lookout to
prevent the machine from being operated mistakenly
by other personnel.
5. Be sure to place pilot control shut-off lever (1) in the
LOCK position.
6. Attach an “UNDER INSPECTION/MAINTENANCE”
tag to an easy-to-see place such as the cab door or
one of the control levers.
M1M7-05-024
M1MS-03-001
1
Summary of Contents for ZAXIS 17U-2
Page 1: ......
Page 7: ...CONTENTS MEMO ...
Page 9: ...MACHINE NUMBERS MEMO ...
Page 39: ...SAFETY S 30 MEMO ...
Page 41: ...SAFETY SIGNS S 32 SS4387344 SS 2901 SS3090482 SS 2869 SS3088058 SS 2870 ...
Page 42: ...SAFETY SIGNS S 33 SS4433590 SS 2871 SS4604981 SS 2872 SS4642517 SS 2873 ...
Page 45: ...SAFETY SIGNS S 36 MEMO ...
Page 53: ...OPERATOR S STATION 1 8 MEMO ...
Page 55: ...BREAK IN 2 2 MEMO ...
Page 71: ...DRIVING THE MACHINE 4 10 MEMO ...
Page 97: ...OPERATION 5 26 MEMO ...
Page 103: ...TRANSPORTING 6 6 MEMO ...
Page 116: ...MAINTENANCE 7 13 7 Swing post M1MS 07 008 ...
Page 165: ...MAINTENANCE 7 62 MEMO ...
Page 167: ...CONSUMABLE PARTS LIST 8 2 MEMO ...
Page 169: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 179: ...REFERENCE 13 2 MEMO ...
Page 183: ...INDEX 14 4 MEMO ...