MAINTENANCE
7-11
A. GREASING
Front Joint Pins (Incl. Swing Post Joint Pins)
--- every 500 hours or every year (every 100
hours up to 500 hours of operation)
1. Position machine with the arm cylinder fully retracted
and the bucket cylinder fully extended. Lower bucket
to the ground (the front attachment inspection posi-
tion). All greasing points can be lubricated from the
ground.
2. Grease all grease fittings illustrated below.
(1) Boom cylinder rod end
(2) Boom
cylinder
bottom
: Greasing Point
M1M7-05-024
M1M7-07-020
M1MS-07-007
Summary of Contents for ZAXIS 17U-2
Page 1: ......
Page 7: ...CONTENTS MEMO ...
Page 9: ...MACHINE NUMBERS MEMO ...
Page 39: ...SAFETY S 30 MEMO ...
Page 41: ...SAFETY SIGNS S 32 SS4387344 SS 2901 SS3090482 SS 2869 SS3088058 SS 2870 ...
Page 42: ...SAFETY SIGNS S 33 SS4433590 SS 2871 SS4604981 SS 2872 SS4642517 SS 2873 ...
Page 45: ...SAFETY SIGNS S 36 MEMO ...
Page 53: ...OPERATOR S STATION 1 8 MEMO ...
Page 55: ...BREAK IN 2 2 MEMO ...
Page 71: ...DRIVING THE MACHINE 4 10 MEMO ...
Page 97: ...OPERATION 5 26 MEMO ...
Page 103: ...TRANSPORTING 6 6 MEMO ...
Page 116: ...MAINTENANCE 7 13 7 Swing post M1MS 07 008 ...
Page 165: ...MAINTENANCE 7 62 MEMO ...
Page 167: ...CONSUMABLE PARTS LIST 8 2 MEMO ...
Page 169: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 179: ...REFERENCE 13 2 MEMO ...
Page 183: ...INDEX 14 4 MEMO ...