BREAK-IN
2-1
BREAKING IN NEW MACHINE
IMPORTANT: Operating a new machine at full load
without first breaking in can cause
scratches and/or seizures, consequently
affecting the service life of the machine.
Thoroughly perform break-in operation.
The service life and performance of the machine can be
greatly affected by operation and maintenance of the ma-
chine during the initial stage of operation. Perform break-in
operation with the engine output less than 80% of the
maximum output for the first 50 hours.
Summary of Contents for ZAXIS 17U-2
Page 1: ......
Page 7: ...CONTENTS MEMO ...
Page 9: ...MACHINE NUMBERS MEMO ...
Page 39: ...SAFETY S 30 MEMO ...
Page 41: ...SAFETY SIGNS S 32 SS4387344 SS 2901 SS3090482 SS 2869 SS3088058 SS 2870 ...
Page 42: ...SAFETY SIGNS S 33 SS4433590 SS 2871 SS4604981 SS 2872 SS4642517 SS 2873 ...
Page 45: ...SAFETY SIGNS S 36 MEMO ...
Page 53: ...OPERATOR S STATION 1 8 MEMO ...
Page 55: ...BREAK IN 2 2 MEMO ...
Page 71: ...DRIVING THE MACHINE 4 10 MEMO ...
Page 97: ...OPERATION 5 26 MEMO ...
Page 103: ...TRANSPORTING 6 6 MEMO ...
Page 116: ...MAINTENANCE 7 13 7 Swing post M1MS 07 008 ...
Page 165: ...MAINTENANCE 7 62 MEMO ...
Page 167: ...CONSUMABLE PARTS LIST 8 2 MEMO ...
Page 169: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 179: ...REFERENCE 13 2 MEMO ...
Page 183: ...INDEX 14 4 MEMO ...