MAINTENANCE
7-54
Installing Rubber Track
1. Lower the bucket and blade to raise both tracks off
ground. Place blocks under machine frame to support
the machine.
2. Slowly turn valve (1) counterclockwise to allow
grease to escape from the grease outlet.
3. Engage the rubber track with the sprocket and
position the other end of the rubber track on the front
idler.
4. While rotating the sprocket in reverse, apply
horizontal force to the rubber track to seat it on the
idler.
5. Insert a steel pipe into gaps among lower rollers,
track frame and rubber track and rotate the rubber
track slowly to correctly seat the rubber track on the
idler.
6. Confirm that the rubber track is correctly engaged
with the sprocket and idler.
7. Adjust track sag. (See page 7-51.)
8. After checking that the rubber track is correctly
engaged with the sprocket and idler and the track sag
is correctly adjusted, lower the machine to the
ground.
M1LA-07-036
M503-07-062
M503-07-063
Direction of Rotation
Steel Pipes
Direction of Rotation
Steel Pipes
2
1
Grease Outlet
Summary of Contents for ZAXIS 17U-2
Page 1: ......
Page 7: ...CONTENTS MEMO ...
Page 9: ...MACHINE NUMBERS MEMO ...
Page 39: ...SAFETY S 30 MEMO ...
Page 41: ...SAFETY SIGNS S 32 SS4387344 SS 2901 SS3090482 SS 2869 SS3088058 SS 2870 ...
Page 42: ...SAFETY SIGNS S 33 SS4433590 SS 2871 SS4604981 SS 2872 SS4642517 SS 2873 ...
Page 45: ...SAFETY SIGNS S 36 MEMO ...
Page 53: ...OPERATOR S STATION 1 8 MEMO ...
Page 55: ...BREAK IN 2 2 MEMO ...
Page 71: ...DRIVING THE MACHINE 4 10 MEMO ...
Page 97: ...OPERATION 5 26 MEMO ...
Page 103: ...TRANSPORTING 6 6 MEMO ...
Page 116: ...MAINTENANCE 7 13 7 Swing post M1MS 07 008 ...
Page 165: ...MAINTENANCE 7 62 MEMO ...
Page 167: ...CONSUMABLE PARTS LIST 8 2 MEMO ...
Page 169: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 179: ...REFERENCE 13 2 MEMO ...
Page 183: ...INDEX 14 4 MEMO ...