MAINTENANCE
7-92
Change Bucket
d
CAUTION: When driving the connecting pins in or
out, guard against injury from flying pieces of metal
or debris. Wear goggles or safety glasses, hard hat and
face shield.
Before starting converting work, keep bystanders clear of the
machine. Slowly move the front attachment. When using a
signal person, coordinate hand signals before starting.
Removal
1. Place the bucket in a stable position.
2. Slide the O-rings out of the way, as shown.
3. Remove bucket pins A and B to separate the arm and
bucket.
Installation
1. Clean the pins and pin bores. Apply sufficient grease to
the pins and pin bores.
2. Place the new bucket in stable position as shown in the
figure.
3. Fit the arm and alternate bucket. Be sure the bucket will
not roll. Install bucket pins A and B.
4. Install the locking pins and snap rings on pins A and B.
5. Install O-rings to the specified positions.
6. Apply grease to each pin.
7. Start the engine and run at slow idle. Slowly operate the
bucket in both directions to check for any interference in
bucket movement.
M104-07-063
O-Ring Shift
Bucket Boss
Link
A
B
Summary of Contents for 090001
Page 4: ......
Page 9: ...CONTENTS Bucket Teeth Transverse Type Pin Used Type 13 18 INDEX 14 1 ...
Page 10: ...CONTENTS MEMO ...
Page 14: ...MACHINE NUMBERS 4 MEMO ...
Page 64: ...MEMO SAFETY SIGNS S 50 ...
Page 198: ...OPERATOR S STATION 1 134 MEMO ...
Page 200: ...BREAK IN 2 2 MEMO ...
Page 212: ...OPERATING THE ENGINE 3 12 MEMO ...
Page 266: ...OPERATING THE MACHINE 5 46 MEMO ...
Page 398: ...MAINTENANCE 7 124 MEMO ...
Page 399: ...8 1 HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT Hydraulic Circuit MDAA 08 001 ...
Page 402: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 404: ...STORAGE 10 2 MEMO ...