OPERATING THE MACHINE
5-45
Precautions for After Operations
After finishing the day's operation, drive the machine to
a firm, level ground where no possibility of falling stones,
ground collapse, or floods is present.
(Refer to the group for "PARKING MACHINE" in the
DRIVING MACHINE section.)
Fully refill the fuel in the fuel tank.
Clean the machine.
Summary of Contents for 090001
Page 4: ......
Page 9: ...CONTENTS Bucket Teeth Transverse Type Pin Used Type 13 18 INDEX 14 1 ...
Page 10: ...CONTENTS MEMO ...
Page 14: ...MACHINE NUMBERS 4 MEMO ...
Page 64: ...MEMO SAFETY SIGNS S 50 ...
Page 198: ...OPERATOR S STATION 1 134 MEMO ...
Page 200: ...BREAK IN 2 2 MEMO ...
Page 212: ...OPERATING THE ENGINE 3 12 MEMO ...
Page 266: ...OPERATING THE MACHINE 5 46 MEMO ...
Page 398: ...MAINTENANCE 7 124 MEMO ...
Page 399: ...8 1 HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT Hydraulic Circuit MDAA 08 001 ...
Page 402: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 404: ...STORAGE 10 2 MEMO ...