(APPENDIX VII) CALIBRATION OF THE CONTROL UNIT |
PAGE 95
13. APPENDIX V: CALIBRATION OF THE CONTROL
UNIT
The CEx7 control unit allows calibration adjustments to be made to the voltage
measurements of the genset and network (only control units CEA7 and CE-
A7CC2). For this purpose, it is enabled in the Parameters menu
Measurements
of parameters 3, 4 and 5 for calibrating the voltages R, S and T of the genset;
also, parameters 14, 15 and 16 are enabled for calibrating the voltages U, V and
W of the network (only control units CEA7 and CEA7CC2). To carry out this pro-
cess, the enabling of a manufacturer level password is required.
* * * *
P A R A M E T E R S
* * * *
1 . D r a w i n g d i m e n s i o n
2 . T i m e s
3 . R e g u l a t i o n s
To access the calibration process pressed the key
to access the parameter
that calibrates the corresponding phase.
* * * * M E A S U R E M E N T S * * * *
When entering calibration mode, the current voltage measurement between
phase and neutral of the corresponding phase is shown:
* * * * M E A S U R E M E N T S * * * *