PLANNING YOUR SOLARMOUNT-I™ INSTALLATION

The installation can be laid out with beams parallel to 
the rafters or perpendicular to the rafters.  Note that 
SolarMount-I™ Beams make excellent straight edges 
for doing layouts.
Center the installation area over the structural members 
as much as possible.
Leave enough room to safely move around the array 
during installation. Some building codes require 
minimum clearances around such installations, and the 
user should be directed to also check ‘The Code’.
The width of the installation area equals the length of 
one module.

The length of the installation area is equal to:

•  The total width of the modules,
•  Plus 1 inch for each space between modules (for 

mid-clamp),

•  Plus 3 inches (1½ inches for each pair of  

end clamps). 

To speed installation, mark beam at approximate 
proper foot space before clicking connections to beam.

High-profile

mode

Low-profile

mode

Peak

Gutter

Eav

e

Eav

e

Flange Attachment
SolarMount-I Rail
Rail Splice

Key

}
}

}

}

}

}

}
}

B

B

B

B

A

A

A

A

Dimension A: 

Attachments on either side of a splice 

that is NOT positioned over an attachment must be 

within ⅓ the max span for your installation.

Note:

 There must be a minimum of TWO attachments 

on either side of a splice.

Dimension B: 

Maximum canitlever cannot exceed ⅓ 

the max span for your installation

Summary of Contents for UNIRAC SolarMount-I

Page 1: ...INSTALLATION MANUAL Pub 110518 1ii May 2011 2011 by Unirac Inc All rights reserved SolarMount I R A HILTI GROUP COMPANY 1411 Broadway Boulevard NE Albuquerque NM 87102 1545 USA...

Page 2: ...translated to another language without the prior written consent of Unirac Unirac Inc Marketing Department 1411 Broadway Boulevard NE Albuquerque NM 87102 1545 Unirac Inc 2011 All rights reserved SOLA...

Page 3: ...s 1 2 Flange Connector UGC 2 Grounding Beam Splice Shown without grounding option 2 Stainless steel hex bolt 2 Stainless steel flange nut 1 Beam Splice Mid Clamp 1 Stainless steel hex bolt 1 Stainless...

Page 4: ...3 4 Hex Head Bolt 1 3 8 x 1 3 4 EPDM Washer PV Quick Mount 1 5 16 x 3 1 2 Stainless Steel Lag Bolt 1 5 16 Sealing Washer 1 5 16 EPDM Washer 1 1 Flange Connection CreoTecc Tile Hook Top 2 5 16 x 3 1 2...

Page 5: ...he length of one module The length of the installation area is equal to The total width of the modules Plus 1 inch for each space between modules for mid clamp Plus 3 inches 1 inches for each pair of...

Page 6: ...e double wall side before clicking connection into beam NOTE Do not use connection if the engagement features on the connection are bent damaged or obstructed by debris 1 2 3 Beam NOTE When installing...

Page 7: ...en using 2 Flange Connection w Butyl Pad remove liner before installing screws 2 Flange Connection Option 1 Flange Connection Option Lag Bolt Concealor Screw Step 3 Install appropriate number of slide...

Page 8: ...Please refer to technical datasheets for recommended distances between splices NOTE Use anti seize on bolt and tighten nut to 10 foot pounds Step 4A Install Splices 1 Use when splicing two beams at a...

Page 9: ...Step 5 Installing Grounding Lugs Grounding Lug Step 6 Install modules using top mounting hardware NOTE Use anti seize on bolt and tighten nut to 10 foot pounds Module End Clamp Module Module Mid Clamp...

Page 10: ...irac com Warranty Information See http www unirac com for current warranty documents and information WARRANTY INSTALLATION MANUAL SolarMount I YOUR UNIRAC DISTRIBUTOR SOLIGENT 800 967 6917 www soligen...

Reviews: