background image

Hilti HIT-RE 100 mortar w/ 

rebar (as post-installed conn.)

 

04 / 2016 

 11 

Basic design data for rebar design according to rebar ETA 

Bond strength in N/mm² according to ETA 

– 15/0883 for good bond conditions 

for hammer drilling, compressed air drilling and diamond coring dry

Rebar [mm]

Concrete class 

C12/15 

C16/20 

C20/25 

C25/30 

C30/37 

C35/45 

C40/50 

C45/55 

C50/60 

8 - 32 

1,6 

2,0 

2,3 

2,7 

3,0 

3,4 

3,7 

4,0 

4,3 

34 

1,6 

2,0 

2,3 

2,6 

2,9 

3,3 

3,6 

3,9 

4,2 

36 

1,5 

1,9 

2,2 

2,6 

2,9 

3,3 

3,6 

3,8 

4,1 

40 

1,5 

1,8 

2,1 

2,5 

2,8 

3,1 

3,4 

3,7 

4,0 

For all other bond condiions multiply the values by 0,7. 

Bond strength in N/mm² according to ETA 

– 15/0883 for good bond conditions 

diamond coring wet

Rebar [mm]

Concrete class 

C12/15 

C16/20 

C20/25 

C25/30 

C30/37 

C35/45 

C40/50 

C45/55 

C50/60 

8 - 32 

1,6 

2,0 

2,3 

2,7 

34 

1,6 

2,0 

2,3 

2,6 

36 

1,5 

1,9 

2,2 

2,6 

40 

1,5 

1,8 

2,1 

2,5 

For all other bond condiions multiply the values by 0,7. 

Amplification factor α

lb

 for the minimum anchorage length and minimum lap length according to 

EN 1992-1-1

For Hammer drilling

 (HD) and c

ompressed air drilling  

(CA)

Rebar 

[mm] 

Concrete class 

C12/15 

C16/20 

C20/25 

C25/30 

C30/37 

C35/45 

C40/50 

C45/55 

C50/60 

8 - 40 

1,0 

For diamond coring dry

 (PCC)

 and wet 

(DD)

Rebar 

[mm] 

Concrete class 

C12/15 

C16/20 

C20/25 

C25/30 

C30/37 

C35/45 

C40/50 

C45/55 

C50/60 

8 - 40 

1,5 

Summary of Contents for HIT-RE 100

Page 1: ...suitable for embedment length till 3200 mm Statik mixer Rebar Base material Load conditions Concrete Dry concrete Wet concrete Static quasi static Installation conditions Other informations Hammer dri...

Page 2: ...6 Setting details For detailed information on installation see instruction for use given with the package of the product Curing time for general conditions 1 Data according ETA 15 0883 issue xxx Tempe...

Page 3: ...drill hole the drill hole shall be filled with mortar Drill the hole to the required embedment depth using a hammer drill with carbid drill bit set in rotation hammer mode a compressed air drill or a...

Page 4: ...essed air cleaning CAC For all drill hole diameters d0 and all drill hole depths h0 20 d Blow 2 times from the back of the hole if needed with nozzle extension over the whole length with oil free comp...

Page 5: ...DRS is recommended In addition for wet diamond corind DD For all drill hole diameters d0 and all drill hole depths h0 Flush 2 times by inserting a water hose water line pressure to the back of the ho...

Page 6: ...d above For each new foil pack a new mixing nozzle must be used Discard quantities are 3 strokes for 330 ml foil pack 4 strokes for 500 ml foil pack 65 ml for 1400 ml foil pack Inject adhesive Inject...

Page 7: ...ction Mark the required mortar level m and embedment depth v with tape or marker on the injection extension estimation lm 1 3 lv precise formula for optimum mortar volume lm lv 1 2 2 d0 2 0 2 For over...

Page 8: ...it from falling till mortar started to harden e g using wedges HIT OHW For overhead installation use piston plugs and fix embedded parts with e g wedges After installing the rebar the annular gap mus...

Page 9: ...Diamond coring Dry PCC Wet DD 8 12 10 a 12 10 a 10 14 12 a 14 12 a 12 16 14 a 17 16 14 a 14 18 17 18 16 20 20 20 18 22 22 22 20 25 24 b 26 25 22 28 28 28 24 32 32 35 32 25 32 30 b 32 30 b 35 32 26 35...

Page 10: ...ions multiply the values by 0 7 Bond strength in N mm according to ETA 15 0883 for good bond conditions diamond coring wet Rebar mm Concrete class C12 15 C16 20 C20 25 C25 30 C30 37 C35 45 C40 50 C45...

Page 11: ...22 C20 25 2 3 165 3 330 312 1040 728 22 C50 60 4 3 165 3 330 220 556 389 24 C20 25 2 3 196 6 360 340 1134 794 24 C50 60 4 3 196 6 360 240 607 425 25 C20 25 2 3 213 4 375 354 1181 827 25 C50 60 4 3 21...

Reviews: