background image

 

Hilti HIT-RE 100 mortar w/     

rebar (as post-installed conn.)

 

 
 

04 / 2016 

                                            3 

 

 

Materials 

Reinforcmenent bars according to EC2 Annex C Table C.1 and C.2N. 
 

Properties of reinforcement 

Product form 

Bars and de-coiled  rods 

Class 

Characteristic yield strength f

yk

 or f

0,2k

 (MPa) 

400 to 600 

Minimum value of k = (f

t

/f

y

)

k

 

≥ 1,08 

≥ 1,15 
< 1,35 

Characteristic strain at maximum force, 

uk

 (%) 

≥ 5,0 

≥ 7,5 

Bendability 

Bend / Rebend test 

Maximum deviation from 
nominal mass  
(individual bar) (%) 

Nominal bar size (mm) 
≤ 8 
> 8 

 

± 6,0 
± 4,5 

Bond: 
Minimum relative rib area, 
f

R,min

 

Nominal bar size (mm) 
8 to 12 
> 12 

 

0,040 
0,056 

 
 

Setting details 

For detailed information on installation see instruction for use given with the package of the product. 

 

Curing time for general conditions

1)

 

Data according ETA-15/0883, issue xxx 

Temperature 

of the 

base material 

Working time in which 

rebar can be inserted and 

adjusted  t

gel 

Initial curing time 

t

cure,ini

 

Curing time before rebar 

can be fully loaded  t

cure 

5 °C  

 T

BM

 

≤ 9 °C 

2 h 

18 h 

72 h 

9 °C < T

BM

 

≤ 14 °C 

1,5 h 

12 h 

48 h 

15 °C < T

BM

 

≤ 19 °C 

30 min 

8 h 

24 h 

20 °C < T

BM

 

≤ 24 °C 

25 min 

6 h 

12 h 

25 °C 

 T

BM

  

≤  29 °C 

20 min 

5 h 

10 h 

30 °C 

 T

BM

  

  39 °C 

12 min 

4 h 

8 h 

T

BM

 = 40

 

°C 

12 min 

2 h 

4 h 

 

1)

 The curing time data are valid for dry base material only. In wet base material the curing times must be doubled. 

The temperature of the foil pack must be b5° C and + 40° C during use. 
 
 
 
 
 
 
 
 
 
 

 
 
 
 

 

Summary of Contents for HIT-RE 100

Page 1: ...suitable for embedment length till 3200 mm Statik mixer Rebar Base material Load conditions Concrete Dry concrete Wet concrete Static quasi static Installation conditions Other informations Hammer dri...

Page 2: ...6 Setting details For detailed information on installation see instruction for use given with the package of the product Curing time for general conditions 1 Data according ETA 15 0883 issue xxx Tempe...

Page 3: ...drill hole the drill hole shall be filled with mortar Drill the hole to the required embedment depth using a hammer drill with carbid drill bit set in rotation hammer mode a compressed air drill or a...

Page 4: ...essed air cleaning CAC For all drill hole diameters d0 and all drill hole depths h0 20 d Blow 2 times from the back of the hole if needed with nozzle extension over the whole length with oil free comp...

Page 5: ...DRS is recommended In addition for wet diamond corind DD For all drill hole diameters d0 and all drill hole depths h0 Flush 2 times by inserting a water hose water line pressure to the back of the ho...

Page 6: ...d above For each new foil pack a new mixing nozzle must be used Discard quantities are 3 strokes for 330 ml foil pack 4 strokes for 500 ml foil pack 65 ml for 1400 ml foil pack Inject adhesive Inject...

Page 7: ...ction Mark the required mortar level m and embedment depth v with tape or marker on the injection extension estimation lm 1 3 lv precise formula for optimum mortar volume lm lv 1 2 2 d0 2 0 2 For over...

Page 8: ...it from falling till mortar started to harden e g using wedges HIT OHW For overhead installation use piston plugs and fix embedded parts with e g wedges After installing the rebar the annular gap mus...

Page 9: ...Diamond coring Dry PCC Wet DD 8 12 10 a 12 10 a 10 14 12 a 14 12 a 12 16 14 a 17 16 14 a 14 18 17 18 16 20 20 20 18 22 22 22 20 25 24 b 26 25 22 28 28 28 24 32 32 35 32 25 32 30 b 32 30 b 35 32 26 35...

Page 10: ...ions multiply the values by 0 7 Bond strength in N mm according to ETA 15 0883 for good bond conditions diamond coring wet Rebar mm Concrete class C12 15 C16 20 C20 25 C25 30 C30 37 C35 45 C40 50 C45...

Page 11: ...22 C20 25 2 3 165 3 330 312 1040 728 22 C50 60 4 3 165 3 330 220 556 389 24 C20 25 2 3 196 6 360 340 1134 794 24 C50 60 4 3 196 6 360 240 607 425 25 C20 25 2 3 213 4 375 354 1181 827 25 C50 60 4 3 21...