Hilti HIT-RE 100 mortar w/     

rebar (as post-installed conn.)

 

 
 

04 / 2016 

                                            5 

 

 

Drill hole cleaning 

The drill hole must be free of dust, debris, water, ice, oil, grease and other 
contaminants prior to mortar injection.  
 
Just before setting the bar, the drill hole must be free of dust and debris 
by one of two cleaning methods described below. 
Inadequate hole cleaning = poor load values.  
 

Manual Cleaning (MC)

   

 

For drill hole diameters d

0

 

≤ 20mm and drill hole depths h

0

 

 

≤ 10·d. 

 

 

 

 
Blow at least 4 times  from the back of the drill hole until return air 
stream is free of noticeable dust.  
 

 

 

Brush 4 times with the specified brush by inserting the steel brush 
Hilti HIT-RB to the back of the hole (if needed with extension) in a 
twisting motion and removing it.  
The brush shall produce natural resistance as it enters the drill hole 
(brush Ø ≥ drill hole Ø) - If this is not the case, please use a new 
brush or a brush with a larger diameter. 
 

 

 

Blow at least 4 times  from the back of the drill hole until return air 
stream is free of noticeable dust.  
 

Compressed air cleaning (CAC)   

For all drill hole diameters d

0

 and all drill hole depths h

0

 

≤ 20· d 

 

 

 

 

 

Blow 2 times from the back of the hole (if needed with nozzle 
extension) over the whole length with oil-free compressed air (min. 6 
bar at 6 m³/h

)

 until return air stream is free of noticeable dust.   

 

 

 

 

 

Brush 2 times with the specified brush by inserting the steel brush 
Hilti HIT-RB to the back of the hole (if needed with extension) in a 
twisting motion and removing it.  

The brush shall produce natural resistance as it enters the drill hole 
(brush Ø 

≥ drill hole Ø) - If this is not the case, please use a new 

brush or a brush with a larger diameter. 

 

 

 

 

Blow 2 times again with compressed air until return air stream is free 
of noticeable dust. 

If required use additional accessories and extensions for air nozzle 
and brush to reach back of hole.

 

Compressed air cleaning (CAC)   

For all drill holes deeper than 250 mm (for 

ϕ 8 to ϕ 12) or deeper than 20·ϕ  

 

 

 

 

      (for 

ϕ > 12 mm) 

 

 

Use the appropriate air nozzle Hilti HIT-DL. 

Blow two times from the back of the hole over the hole length with oil-
free compressed air until return air stream is free of noticeable dust. 

Safety tip: 

Do not inhale concrete dust. 

Use of the dust collector Hilti HIT-DRS is recommended. 

Summary of Contents for HIT-RE 100

Page 1: ...suitable for embedment length till 3200 mm Statik mixer Rebar Base material Load conditions Concrete Dry concrete Wet concrete Static quasi static Installation conditions Other informations Hammer dri...

Page 2: ...6 Setting details For detailed information on installation see instruction for use given with the package of the product Curing time for general conditions 1 Data according ETA 15 0883 issue xxx Tempe...

Page 3: ...drill hole the drill hole shall be filled with mortar Drill the hole to the required embedment depth using a hammer drill with carbid drill bit set in rotation hammer mode a compressed air drill or a...

Page 4: ...essed air cleaning CAC For all drill hole diameters d0 and all drill hole depths h0 20 d Blow 2 times from the back of the hole if needed with nozzle extension over the whole length with oil free comp...

Page 5: ...DRS is recommended In addition for wet diamond corind DD For all drill hole diameters d0 and all drill hole depths h0 Flush 2 times by inserting a water hose water line pressure to the back of the ho...

Page 6: ...d above For each new foil pack a new mixing nozzle must be used Discard quantities are 3 strokes for 330 ml foil pack 4 strokes for 500 ml foil pack 65 ml for 1400 ml foil pack Inject adhesive Inject...

Page 7: ...ction Mark the required mortar level m and embedment depth v with tape or marker on the injection extension estimation lm 1 3 lv precise formula for optimum mortar volume lm lv 1 2 2 d0 2 0 2 For over...

Page 8: ...it from falling till mortar started to harden e g using wedges HIT OHW For overhead installation use piston plugs and fix embedded parts with e g wedges After installing the rebar the annular gap mus...

Page 9: ...Diamond coring Dry PCC Wet DD 8 12 10 a 12 10 a 10 14 12 a 14 12 a 12 16 14 a 17 16 14 a 14 18 17 18 16 20 20 20 18 22 22 22 20 25 24 b 26 25 22 28 28 28 24 32 32 35 32 25 32 30 b 32 30 b 35 32 26 35...

Page 10: ...ions multiply the values by 0 7 Bond strength in N mm according to ETA 15 0883 for good bond conditions diamond coring wet Rebar mm Concrete class C12 15 C16 20 C20 25 C25 30 C30 37 C35 45 C40 50 C45...

Page 11: ...22 C20 25 2 3 165 3 330 312 1040 728 22 C50 60 4 3 165 3 330 220 556 389 24 C20 25 2 3 196 6 360 340 1134 794 24 C50 60 4 3 196 6 360 240 607 425 25 C20 25 2 3 213 4 375 354 1181 827 25 C50 60 4 3 21...