Hilti HIT-RE 100 mortar w/
rebar (as post-installed conn.)
04 / 2016
7
Injection preparation
Tightly attach Hilti mixing nozzle HIT-RE-M to foil pack manifold. Do not
modify the nixing nozzle.
Observe the instruction for use of the dispenser.
Check foil pack holder for proper function. Insert foil pack into foil pack
holder and put holder into dispenser.
The foil pack opens automatically as dispensing is initiated. Depending
on the size of the foil pack an initial amount of adhesive has to be
discarded.
After changing a mixing nozzle, the first few trigger pulls must be
discarded as decribed above. For each new foil pack a new mixing
nozzle must be used.
Discard quantities are
3 strokes for 330 ml foil pack,
4 strokes for 500 ml foil pack,
65 ml for 1400 ml foil pack.
Inject adhesive
Inject adhesive form the back of the drill hole without forming air voids.
Injection method for drill hole depth
≤ 250 mm (without overhead applications)
Inject the adhesive from the back of the hole towards the front and
slowly withdraw the mixing nozzle step by step after each trigger
pull.
Fill holes approximately 2/3 full to ensure that the annular gap
between the rebar and the concrete is completely filled with
adhesive over the embedment length.
After injecting, depressurize the dispenser by pressing the release
trigger. This will prevent further mortar discharge from the mixing
nozzle.