Hilti HIT-RE 100 mortar w/     

rebar (as post-installed conn.)

 

 
 

04 / 2016 

                                            7 

 

 

Injection preparation

 

 

 

 

 

Tightly attach Hilti mixing nozzle HIT-RE-M to foil pack manifold. Do not 
modify the nixing nozzle. 
Observe the instruction for use of the dispenser. 
Check foil pack holder for proper function. Insert foil pack into foil pack 
holder and put holder into dispenser. 
 

 

 

 

  The foil pack opens automatically as dispensing is initiated. Depending 

on the size of the foil pack an initial amount of adhesive has to be 
discarded.  
After changing a mixing nozzle, the first few trigger pulls must be 
discarded as decribed above. For each new foil pack a new mixing 
nozzle must be used. 
Discard quantities are 
 

3 strokes for 330 ml foil pack, 

 

4 strokes for 500 ml foil pack, 

 

65 ml for 1400 ml foil pack. 

Inject adhesive 

 

Inject adhesive form the back of the drill hole without forming air voids. 

Injection method for drill hole depth 

≤ 250 mm (without overhead applications)

 

 

 

 

 

 

Inject the adhesive from the back of the hole towards the front and 
slowly withdraw the mixing nozzle step by step after each trigger 
pull.  
Fill holes approximately 2/3 full to ensure that the annular gap 
between the rebar and the concrete is completely filled with 
adhesive over the embedment length. 

 

 

After injecting, depressurize the dispenser by pressing the release 
trigger. This will prevent further mortar discharge from the mixing 
nozzle. 

 

 

Summary of Contents for HIT-RE 100

Page 1: ...suitable for embedment length till 3200 mm Statik mixer Rebar Base material Load conditions Concrete Dry concrete Wet concrete Static quasi static Installation conditions Other informations Hammer dri...

Page 2: ...6 Setting details For detailed information on installation see instruction for use given with the package of the product Curing time for general conditions 1 Data according ETA 15 0883 issue xxx Tempe...

Page 3: ...drill hole the drill hole shall be filled with mortar Drill the hole to the required embedment depth using a hammer drill with carbid drill bit set in rotation hammer mode a compressed air drill or a...

Page 4: ...essed air cleaning CAC For all drill hole diameters d0 and all drill hole depths h0 20 d Blow 2 times from the back of the hole if needed with nozzle extension over the whole length with oil free comp...

Page 5: ...DRS is recommended In addition for wet diamond corind DD For all drill hole diameters d0 and all drill hole depths h0 Flush 2 times by inserting a water hose water line pressure to the back of the ho...

Page 6: ...d above For each new foil pack a new mixing nozzle must be used Discard quantities are 3 strokes for 330 ml foil pack 4 strokes for 500 ml foil pack 65 ml for 1400 ml foil pack Inject adhesive Inject...

Page 7: ...ction Mark the required mortar level m and embedment depth v with tape or marker on the injection extension estimation lm 1 3 lv precise formula for optimum mortar volume lm lv 1 2 2 d0 2 0 2 For over...

Page 8: ...it from falling till mortar started to harden e g using wedges HIT OHW For overhead installation use piston plugs and fix embedded parts with e g wedges After installing the rebar the annular gap mus...

Page 9: ...Diamond coring Dry PCC Wet DD 8 12 10 a 12 10 a 10 14 12 a 14 12 a 12 16 14 a 17 16 14 a 14 18 17 18 16 20 20 20 18 22 22 22 20 25 24 b 26 25 22 28 28 28 24 32 32 35 32 25 32 30 b 32 30 b 35 32 26 35...

Page 10: ...ions multiply the values by 0 7 Bond strength in N mm according to ETA 15 0883 for good bond conditions diamond coring wet Rebar mm Concrete class C12 15 C16 20 C20 25 C25 30 C30 37 C35 45 C40 50 C45...

Page 11: ...22 C20 25 2 3 165 3 330 312 1040 728 22 C50 60 4 3 165 3 330 220 556 389 24 C20 25 2 3 196 6 360 340 1134 794 24 C50 60 4 3 196 6 360 240 607 425 25 C20 25 2 3 213 4 375 354 1181 827 25 C50 60 4 3 21...