
PGL-KIT-RZRT
17
8.
INSTALL FRONT BRAKE ROTOR ASSEMBLY
a.
Apply waterproof grease to the spindle splines. Then slide the brake rotor assembly onto the spindle shaft.
a.
Install the supplied
3/4 SAE grade 8 flat washer
& tighten the
3/4-16 slotted castle nut
. (1-
1/16”
-27mm)
[Minimum 120 ft lbs] Tighten the slotted nut further if needed to align grooves with holes in spindle for
cotter pin. Install the supplied large
cotter pin
. Both ends of the cotter pin must be folded.
9.
ADJUST FRONT CAMBER
a.
When checking the camber, it is
necessary that the unit is leveled
. You can do this by properly positioning
jack stands, bottle/floor jacks, and using a leveling tool. Be careful and make sure the unit is secure during
this process.
b.
Now check the camber and determine if it is positive or negative. You want to set it as close as you can to
ZERO. To do this, you can visually look down the side of your UTV and use an angle locator tool. If it is
good, proceed to step #7. If not, then continue following these steps.
Summary of Contents for PGL-KIT-RZRT
Page 1: ...PGL KIT RZRT 1...
Page 6: ...PGL KIT RZRT 6 PARTS DIAGRAM...
Page 7: ...PGL KIT RZRT 7...