650.65-N2 

VENT TERMINAL  ASSEMBLY 

The  combustion  air and  vent  piping  must  terminate  outdoors 

using  the Vent Terminal  Assembly  Kits. 

Two  vertical vent terminal  kits are available.  The 1 VK0307  kit 

is to 

be 

used  with1-1/2" and 2" piping,  and the 1VK03 08  is to 

be 

used  for 3"  piping.  Two  horizontal  vent  terminal  kits  are 

available.  The 1VK0311  kit  is  to  be  used  with 1-1/2"  and 2" 

piping,  and the 1VK0312 is 

to  be 

used for 3" piping. 

NOT£: 

The 

s· 

vent  terminal  kit  contains one  elbow 

having 

"splitter  baffle•  in  qne opening.  This elbow must  be  used 

for the  combustion air intake. 

Each  kit contains the following components: 

1.  One terminal bracket with 2 

-

90. 

degree  PVC elbows. 

2.A)ne 

90 

degree  PVC street  elbow. 

3.  One 

90 

degree  PVC elbow. 

4. 

One PVC pipe coupling. 

5.  Installation instructions. 

This terminal kit  may 

be 

used for rooftop  or side wall installation. 

Rooftop termination is  the recommended means,  and  should 

be 

arranged according to one of the methods shown in ·Figure 

6. 

NOTE: 

The 

vent 

terminal kit and exposed 

piping may be  painted 

the  same color  as the building 

to 

make 

them 

less 

noticeable. 

RGURE  6-

ROOFTOP  TERMINATION 

If  optional  side  walt  venting  is  to be used,  installation  of  the 

terminal  kit  should be as  shown in Figures 7 and 8. 

The installation  proc�ure  for the terminal  kit is as follows: 

1.  Cut all 

comb

stion air and vent piping so the vent termina­

tinn  fittinr1<::  � nrl  hr�rlo:>t<::  r_qn 

hA  rlrv-fitted toaether. 

Min.  24.1o 
arry  overhang 

INSTALLATION BELOW ANT ICIPATE D  SNOW  LEVEL 

Min.  24"  to 
any overhang 

INSTALLATION  ABOVE  A N T ICIP ATE D SNOW L EVEL 

FIGURE 

7-

SIDE WALL  TERMINATION 

2.  All  piping  should  be  deburred  inside  and  out,  and  the 

outside  edge should 

be 

chamfered. 

3.  Reassembly  all  piping  and  fittings  using  cement  primer 

and  cement  per  the  cement  manufacturer's  instructions. 

Primer and cement must conform to  ASTM 

2564 

for PVC 

or  ASTM D2235 for ABS piping. 

4. 

Reattach and tighten the vent termination bracket. 

INTAKE 

(Spodal elbow) 

FIGURE 

8,. 

SIDEWALL TERMINATIONS 

GAS  PIPING 

NOTE: 

An  accessible  manual 

shutoff 

valve 

must  be  instafled 

upstream 

-of  the fum ace  gas 

controls and  within 

feet  of 

the 

l

u

m

a

c

A  UB"  NPT 

plugged  tapping,  accessible for 

test 

gauge connection  must  be  instafled  immediately up­

stream  of the"gas supply connection to the fumace. 

Summary of Contents for PBNU-LD06N040

Page 1: ...th low NOx mlss 9ns o 35 nanograms joule 100 shut off main gas valve for extra safety Propane modet convertible to natural gas PSG multlpte speed direct dove mJtor with large quiet blower 24V 40 VA co...

Page 2: ...g Extinguish any open flames Immediately call your gas supplier from a neighbor s phone Folio the gas sup plier s instructions If you cannot reach your gas supplier call the fire department 035 10976...

Page 3: ...are not handled property CAUTION The cooling coil must be installed in the supply air Condensate Piping 9 Electrical Data 9 Electrical Connections 9 10 Safety Controls 10 Start Up Adjustments 10 11 I...

Page 4: ...water codes and other applicable codes CAUTION Do notinstall the furnace in an unconditioned space or garage that could experience ambient temperatures of 3Z F 0 8 or lower CAUTION This unit must be...

Page 5: ...ia K O CAS INLcr f tr l 114 x VENT OOTLET 3 dia K O 2 8 1 2 LEFT SIDE 2 7 16 _ c D 11 2 15 2 15 2 21 2 21 3 21 3 21 3 25 3 Blower Max Outlet Temp HP Size OF 175 1 5 9 4 175 113 1 6 175 1 2 11 8 175 1...

Page 6: ...ere vent gas coutd enter the building 1 foot Above grade and anticipated snow depth 1 foot Above rade when adjacent to a publtc walkway _ 7 feet From electric gas meters regulators and rehef equipll e...

Page 7: ...his procedure To remove a filter from the side location push the closed end of the filter retainer down until it clears the flange on the side panel which acts as a catch for the retainer When the ret...

Page 8: ...s including pilots Do not breatht vapors and avoid contact with skin and eyes 6 All joints must be made to provide a permanent air tight water tight seal The only exception to this means o joining is...

Page 9: ...ame color as the building to make them less noticeable RGURE 6 ROOFTOP TERMINATION If optional side walt venting is to be used installation of the terminal kit should be as shown in Figures 7 and 8 Th...

Page 10: ...ocedure for condensate piping is as follows 1 Determine whether the condensate drain line will be in stalled through the right or left side of he furnace Unitary Products Group 650 65 N2 2 Carefully r...

Page 11: ...rminal board on the low voltage transformer Typical control wiring is shown in Figure 1OA Set the heat anticipator in t he room thermostat to 1 16 amps Setting it lower will cause short cycles Setting...

Page 12: ...surface igniter to begin glowing c If glow is seen turn the thermostat down below room temperature Hot surface igniter should stop glowing 3 Tum the gas supply ON at external valve and main gas valve...

Page 13: ...lly has a 1 2 or 1 cubic foot test dial 3 Using the number of seconds for each revolution and the size of the test dial increment find the cubic feet of gas t _ L L I TABLE 3 GAS RATE CUBIC FEET PER H...

Page 14: ...lay 3R which energizes the venter When the proper amount of combustion air is being provided a pressure switch activates the SOE47 ignition control A sec ond and third pressure switch 2LP or 3LP and 4...

Page 15: ...xchanger 1 Turn off the main manual gas valve extern to the furnace 2 Turn off the electrical power to the furnace 4 Disconnect the gas supply piping and control wiring from the gas valve 5 Remove the...

Page 16: ...rain trap has been emptied during this cleaning procedure refill it by following the instructions foundin the start Up andAdjustment section on this instruction 650 65 N2 13 Operate the unit for a min...

Page 17: ...2Jl Jl llP 2L lrS 1IIP TS IS IP 0 rn 6 o R lllm E Lilt lUI CN ICITCJl flUY II 1 M R I TOO flUY CDC flUr rrCJl ttJTm W TT 1l lflTOl IX Oll SWITOi SYI I Ol lltOit T ROO 24 110 i vtRIte tt1 LOO 115 X T I...

Page 18: ...ffi l l KJTrn B FETf NITG UXXli l l tlTG l tITGl F fl JRR fl ilTD 1 ocx KETI PllXl 24 YQT V RII ll ro J E TI PlLO liS VQT r AII ll ro xE1 Tarf 2 VIIS YQT lim ro xFTI PlLO 1 EtilTCJI Iill Tl COifFa a m...

Page 19: ...ansformer thermostat controller and wiring Place jumper on Place jumper pressure switch 1 LP on relay 3R Replace I between C NC between 1 3 venter Venter Okay Venter Okay YES YES r Check hoses connect...

Reviews: