21D-265C
50
Applied operation
7-1. Working setting 2
,
3-Setting the Tact reservation (With working hour)
This article describes about the Working setting
”2” and “3”.
When the Working setting (M=?) is represented by
“
2
”
or
“
3
”
in the Operating status
screen, the Function settings stated in the following table is set.
Working
setting
With/Without of Tact reserve
function [5]
With/Without of working hour [6]
Tact
reservation
Cumulative
display
For use of Working hour
“
2
”
Yes
No
Yes
“
3
”
Yes
Yes
Yes
The operation carried out by the Working setting
“
2
”
“
3
”
includes Tact reserve function in
addition to the Basic operation. This article only describes the Tact reserve function.
To change the tact during work of one day, you can reserve the tact up to 20-type for each
work order.
To reserve the tact, register
“Tact”, “Target production quantity” and “Setup time”
beforehand.
The tact can be changed at the time when the production actual reaches the target production
quantity. For the display methods, you have to set either Cumulative display or Individual
display.
Registered items
Contents
Work quantity
20 types at max
Reserved contents
Tact
0.1-9999.9sec
or
0.01-999.99sec
Target production quantity:
4-digit-type:0-9999
5-digit-type:0-99999
Setup time
0-998min
Display method
Cumulative display
or
Individual display
<Displayed contents>
Command
Cumulative display
(Working setting
“
3
”
)
Individual display
(Working setting
“
2
”
)
Target
Displays total target production quantity
today
Displays target production quantity of
the present reserve No.
Plan
Displays
total
planned
production
quantity at present time
Displays planned production quantity of
present reserve No.
Actual
Displays total production actual at
present time
Displays production actual of present
reserve No.
Advancement
Displays advancement degree in
±
against
total
planned
production
quantity at present time
Displays Advancement degree in
±
against planned production quantity
at present time
Accomplishment
rate
Displays Accomplishment rate of Actual
against
total
planned
production
quantity at present time
Displays Accomplishment rate of Actual
against planned production quantity at
present time