21D-265C
57
Applied operation
<Tact switching timing>
The tact switching timing is the time when target production quantity is consistent with
the production actual.
Processing is carried out within working hour setting for the range between the reserve
No. registered as
“1” and the reserve No. ahead of either [999] in setup time or [0] in tact
or [0] in production actual.
If within working hour, processing continues after returning to the reserve No. 1.
Switching timing:
1.When No is manually changed using [2:Reserve No.] of [F1]
2.When inputting through Input terminal
“Tact switch”
3.When Production Actual is reached