Ozone Test - Isolating the CD Tube
When troubleshooting, it is helpful to test the CD
tube for ozone production when it is isolated from
the injector port. Remove the Air Intake Filter
and set aside. Place valve into a condition where
EOG II generator is activated, confirming the LED
status light is on solid green (see page 16). Then
disconnect the brine elbow by removing the lock-
ing clip.
Only remove this when the control is in
the draw cycle.
Connect and use the CD cleaning
syringe to push a gentle flow of air through the CD
tube. A fragrance of ozone should escape through
the brine elbow if the CD tube is producing.
This provides a method of isolating the CD tube to
verify it is functioning properly.
Gen II O
3
with Ozone
Troubleshooting
To check the ozone production, the cycle can be manually started by pressing the RE-
GEN button for about 3 seconds. Let the control advance to the draw cycle on its own,
do not manually advance the cycles. If you push REGEN at any time during the cycling
process, the The EOG II will not activate, and if already activated, theEOG II will turn off.
After the control enters the draw cycle, the EOG II generator will activate 1 minute into
the cycle and the EOG II status light will glow solid green. Then start moving air through
the EOG II to confirm the ozone production.
To Activate the EOG II Generator:
Air Intake
Filter
Cleaning
Syringe &
Tubing
Brine Elbow
1. Unplug the power supply plug on the back of the EOG II or unplug the transformer from the
receptacle.
2. With the front cover removed, remove the CD cell from the ozone generator:
a. Disconnect the red spade terminal connector from the CD cell connection terminal.
b. Cut the CD cell retaining strap (if present) holding the cell into the cell clips, and discard.
c. Disconnect the air inlet and ozone outlet hoses from the CD cell barb fittings.
d. Pull the CD cell straight up from the retaining clips.
3. Replace with new CD cell in reverse order, making sure all air and electrical connections are
secure.
4. Plug in the power supply for the EOG II and test for O
3
production.
Remove and Replace the CD Tube.