Plug the power supply into the receptacle. Refer to the main Eradicator manual for the instructions
for the start up procedure.
The programming for the O

is already done for Eradicator O

3

 systems, so no further action is 

needed beyond the normal start up procedure.

Once set up is complete, start the Eradicator in a manual regeneration and let it complete the
regeneration.

It is highly recommended to have an annual inspection and maintenance on the Eradicator system
to keep it operating at optimum performance.

If any service or maintenance is required, have your customer contact you for this service.

The O

programming chart is below. The first program column is the default setting.

The other two are optional settings
if needed or recommended.

Setting Cycle Sequence
Next & Down 3 seconds & 
repeat*

AIF Filter

AIF Filter

AIF Filter

Meter Size

Match Size

Match Size

Match Size

Auxiliary Input 

OFF

OFF

OFF

Cycle 1

Backwash

Backwash

Backwash

Cycle 2

Rinse

Rinse

Rinse

Cycle 3

REGEN DN

REGEN DN

REGEN DN

Cycle 4

END

END

END

Programming Control

Next & Down 3 Seconds*

AIF Filter

AIF Filter

AIF Filter

Set

Filtering

Filtering

Filtering

Backwash

8

8

8

Rinse

4

4

4

REGEN DN

30

40

60

Gallons Capacity

500

500

500

REGEN Type

Delayed

Delayed

Delayed

Relay 1

Regen Time

Regen Time

Regen Time

Relay 1 Setpoint

13 MIN

13 MIN

13 MIN

Relay 1 Duration

28 MIN

38

58

Relay 2 

OFF

OFF

OFF

Service Alarm

OFF

OFF

OFF

Default Install Settings - Step 4

Next & UP*

AIF Filter

AIF Filter

AIF Filter

Days Between Regen

OFF

OFF

OFF

Regen Time

1:00 AM

1:00 AM

1:00 AM

Energy Saver

OFF

OFF

OFF

Setup Procedures

Start Up

Summary of Contents for AQUA Systems SmartChoice Gen II O3

Page 1: ...Ozone Setup and Service Guide Installation Operation and Service Manual Gen II TM CLOCK REGEN 1200 NEXT GAL GALLONS REMAINING CLOCK REGEN 1200 NEXT GAL GALLONS REMAINING TM 404 Moravian Valley Road Wa...

Page 2: ...is recommended that the owner arrange for annual periodic maintenance by a qualified technician to achieve optimum long term performance The information in this guide is directed to an individual who...

Page 3: ...Ozone Resistant Check Valve Assembly 7 Installation of the EOG II Wire Harness 8 9 Button Combination Guide 10 11 Setup Procedures 12 15 Ozone Programming Logic 12 Changing Programming Times 13 Start...

Page 4: ...in the Eradicator s aeration process works as a Super Oxygen source This technique provides much more oxygen for the oxidation of iron and sulfur and for restoring oxygen sites on the media s surface...

Page 5: ...eases O3 production and quality can be added to this control using the single power supply see separate Air Dryer instruction sheet Gen II EOG II Wire Harness Side View with External Ozone Air Intake...

Page 6: ...clip to the inlet part of the valve body Then snug the clamp screw to secure the EOG II to the control valve Power Supply Transformer Jack Insert Power Supply Plug Here Install the Vertical Adapter E...

Page 7: ...ing Firmly insert the black tubing figure b from the EOG II into the push connect elbow figure a Be sure the tubing has fully seated If the tubing needs to be removed from the elbow press the locking...

Page 8: ...the board forward then lift the board out Next remove the drive bracket by gently lifting the two tabs securing the the bracket and tilt it forward from the tabs The lower edge of the drive bracket h...

Page 9: ...l through about 10 of the harness Then make sure the wire is fully seated in the strain relief slot Reinstall the drive bracket step 2 and the circuit board step 1 in the reverse order of removal Conn...

Page 10: ...UP or the Down Arrow to change a variable Variables that can be changed will be flashing NOTE When the Energy Saver is set to AUTO or ON the dis play backlight will turn off after 5 minutes of no acti...

Page 11: ...Soft Reset From any user screen Press NEXT REGEN together and hold until control resets Will drive all motorized pistons to the Home Position and re set the circuit board Will retain all programming p...

Page 12: ...hen needed through the Relay 1 module of the AQ x software Relay 1 is set to Regen Time The start point is set to the number of minutes that it takes the control to enter the Regeneration Down cycle p...

Page 13: ...cycles did not change Continue Change DURATION from 28 MIN to 38 MIN using Up or DN buttons Once set press NEXT to continue New screen will 38 MIN to reflect the additional DRAW DN time set in previo...

Page 14: ...The O3 programming chart is below The first program column is the default setting The other two are optional settings if needed or recommended Setting Cycle Sequence Next Down 3 seconds repeat AIF Fil...

Page 15: ...t the entire brine elbow off at the locking clip connection to the control valve to check draw and or for ozone Setup Procedures Special Considerations in Checking for Draw with Ozone Gen II O3 with O...

Page 16: ...rol Valve Circuit Board To Relay 1 terminal on Control Valve Circuit Board Connect to Control Valve Not Shown Safety Cover Alarm Reset CD Cell Power Input Ozone Outlet Diagnostic LED Terminal Block Ai...

Page 17: ...RVICING OZOTECH 7 8 No Part No Description Qty 1 02910356 Ext EOG II Ozone Box Complete AS 1 2 02910331 CD Tube 1 3 02910361 Transformer for EOG II 14v 1 4 02910360 Wire Harness for Ext EOG II 1 5 029...

Page 18: ...n after all PM service has been completed see page 15 or page 21 Periodic Maintenance Special Considerations in Annual PM with Eradicator AIF with Ozone Disconnecting the CD Tube for Cleaning Check Oz...

Page 19: ...unger to pull Warm RO or DI wa ter into the syringe The water should be luke warm to the touch If you have a good quality RO bottled water on a hot cold cooler a blend of the two sides will provide a...

Page 20: ...l Circuit Issue Check Status light to confirm solid green light when the EOG II is activated if not refer to status parameters on page 16 to diagnose Correct improper or loose connections Not Producin...

Page 21: ...may need cleaning Green Red light alternating twice per second HV is ON but operating current is low If persistent CD cell may need cleaning Red light flashing NO or NC contacts are shorted Remove sho...

Page 22: ...rol advance to the draw cycle on its own do not manually advance the cycles If you push REGEN at any time during the cycling process the The EOG II will not activate and if already activated theEOG II...

Page 23: ...per operation Water Pressure The system will operate on a minimum of 20 psi and a maximum of 100 psi Flow Rate A minimum of 5 gallons per minute is required for proper system operation If less than 0...

Page 24: ...Eradicator Gen II O3 Manual Supplement Install Service Guide 24 Copyright 2021 Aqua Systems All Rights Reserved 404 Moravian Valley Road Waunakee WI 53597 800904 Rev A 08 02 2021...

Reviews: