27
FIGURE 6-10 Flue on Sidewall, Combustion Air on Roof
FIGURE 6-11 Flue on Sidewall, Inside Combustion Air
Combustion
Air
Vent
12" (305mm)
Anticipated
Snow Line
6 - COMBUSTION AIR AND VENT PIPING
NOTICE
Configurations of single pipe vent with flue on the
sidewall, requires a tee as the vent terminal. See
figures 6-10 and 6-11.
Maintain 12"(305mm) US
(18"(457mm) Canada)
clearance above highest
anticipated snow level 24"
(610mm) above roof
Ground Level
12" (305mm)
Anticipated
Snow Line
Vent
Combustion
Air
Ground Level
Summary of Contents for VX-050
Page 49: ...49 13 TROUBLE SHOOTING...
Page 51: ...51 13 TROUBLE SHOOTING...
Page 63: ...63 14 1 Connection Diagram 050 075 100 MBH 14 WIRING DIAGRAM...
Page 64: ...64 14 2 Schematic Diagram of Ladder Form 050 075 100 MBH 14 WIRING DIAGRAM...
Page 65: ...65 14 3 Connection Diagram 150 200 MBH 14 WIRING DIAGRAM...
Page 66: ...66 14 4 Schematic Diagram of Ladder Form 150 200 MBH 14 WIRING DIAGRAM...
Page 83: ...83 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 50 75 100 MBH...
Page 84: ...84 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 50 75 100 MBH...
Page 85: ...85 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 150 200 MBH...
Page 86: ...86 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 150 200 MBH...
Page 87: ...87 NOTES...
Page 88: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...