80
User Interface Display
Explanation
CH Settings
Outdoor reset boost function increases CH set point by
increment (‘Temp’) if CH demand continues beyond pre-set
time limit (‘Time’).
CH set point will continue to increase until set point reaches
195°F / 91°C
Allowable Temperature Increment: 0..36 °F (0..20 °C)
Default Temperature increment: 0 °F (10 °C)
Allowable Time Delay: 1..120 minutes
Default Time Delay: 20 minutes
Maximum boiler power in CH mode limited by adjusting
‘Maximum Power CH’ setting. Boiler will not exceed this
value while operating in CH Mode.
Allowable Range: 1..100%
Default Setting: 100%
DHW Sett
ings
Two DHW modes are available
• DHW Mode = 0 ‘No DHW
•
DHW Mode is disabled
•
The DHW thermostat input is ignored and the DHW
pump is not used.
•
DHW Mode = 2 ‘DHW Store with Thermostat’
•
Boiler reacts to DHW demand when DHW thermostat
input closes.
•
Boiler modulates to meet DHW demand similar to CH
Mode except DHW set point is used. DHW set point set
in Settings’ submenu found in 'User Menu’.
•
Simultaneous CH & DHW demands handled using DHW
Priority Timing. See ‘DHW Maximum Priority Time’
setting below.
Note:
•
Outdoor reset function disabled while operating in DHW
Mode.
•
Typical when using a DHW indirect storage tank.
•
After DHW demand satisfied, boiler enters post purge
mode and DHW pump continues to run for 15 seconds.
APPENDIX A - CONTROL MODULE
Summary of Contents for VX-050
Page 49: ...49 13 TROUBLE SHOOTING...
Page 51: ...51 13 TROUBLE SHOOTING...
Page 63: ...63 14 1 Connection Diagram 050 075 100 MBH 14 WIRING DIAGRAM...
Page 64: ...64 14 2 Schematic Diagram of Ladder Form 050 075 100 MBH 14 WIRING DIAGRAM...
Page 65: ...65 14 3 Connection Diagram 150 200 MBH 14 WIRING DIAGRAM...
Page 66: ...66 14 4 Schematic Diagram of Ladder Form 150 200 MBH 14 WIRING DIAGRAM...
Page 83: ...83 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 50 75 100 MBH...
Page 84: ...84 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 50 75 100 MBH...
Page 85: ...85 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 150 200 MBH...
Page 86: ...86 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 150 200 MBH...
Page 87: ...87 NOTES...
Page 88: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...