Issued September 2017
On-Route Operation Procedures
Copyright 2017, Heil Environmental
Printed in U.S.A.
121
LOADING REFUSE WITH AN ARM
MECHANISM (CONTINUED)
c. After the refuse container is empty of refuse, PUSH
the control lever for the arm mechanism until the
refuse bin rests firmly on the ground. (RELEASE the
Throttle Advance Switch if you pressed it during
loading.)
d. RELEASE the container from the arm mechanism.
e. PULL the control lever for the arm mechanism until
the arms are fully up and folded.
f. MOVE the container to its pick-up location.
Figure 64. Arm Mechanism Setup
Figure 65. Loading Refuse with Arm Mechanism
Summary of Contents for PT 1000
Page 8: ...NOTES...
Page 10: ...NOTES 2...
Page 36: ...NOTES 28...
Page 64: ...NOTES 56...
Page 68: ...NOTES 60...
Page 84: ...NOTES 76...
Page 90: ...NOTES 82...
Page 150: ...NOTES 142...
Page 154: ...NOTES 146...
Page 158: ...NOTES 150...
Page 162: ...NOTES 154...
Page 200: ...NOTES 192...