Issued September 2017
On-Route Operation Procedures
Copyright 2017, Heil Environmental
Printed in U.S.A.
108
BEFORE LOADING (CONTINUED)
2. The ejector panel should be:
a. For normal route pickup, about three (3) feet from
the tailgate.
b. If starting with bulk refuse, the ejector panel
should be about six (6) feet from the tailgate.
3. The packing mechanism should be in the START
POSITION with the slide fully IN and the packer
blade fully DOWN. See the figure below.
Figure 59. Packer Blade Starting Position
LOADING REFUSE MANUALLY
Use the following procedures at each stop along the route
to manually load refuse into the unit with the lift arm.
Observe the DANGER and WARNING notices.
DANGER
Your body or clothing can become caught by the blade
while it moves. Serious injury or death may occur if a
person is in or near the hopper when the blade and slide
assembly move. Clear the area near the hopper of all
unnecessary people before you move the blade and slide
assembly and keep all parts of your body away from the
blade.
1. Move the slide and blade into the START position.
See the figure to the left.
a. PUSH the slide and blade levers at the same time
and RELEASE the levers. The levers will self-
center at the end of the commanded position by
way of valve internal hydraulic pressure.
b. The slide will move IN and the blade will move
DOWN.
c. The hopper is now ready to receive refuse.
2. Load the refuse from a container into the hopper and
then move the container to the pick-up location.
Summary of Contents for PT 1000
Page 8: ...NOTES...
Page 10: ...NOTES 2...
Page 36: ...NOTES 28...
Page 64: ...NOTES 56...
Page 68: ...NOTES 60...
Page 84: ...NOTES 76...
Page 90: ...NOTES 82...
Page 150: ...NOTES 142...
Page 154: ...NOTES 146...
Page 158: ...NOTES 150...
Page 162: ...NOTES 154...
Page 200: ...NOTES 192...