5.3 Choice of location 

 

`

National Wiring rules may contain restrictions 

concerning the installation of these products in 

bathrooms.

 

`

The product should be vertically wall mounted 

using the wall bracket supplied. The water 

connections must always be to the top of the 

product.

 

`

Enough space should be left at the top above 

the product for pipe connections and access to 

the Temperature/Pressure Relief Valve. Refer to 

figure 1 and the Dimensions Table to determine 

a suitable position for the product.

WARNING

Ensure that the wall can support the full 

weight of the product (see Technical 

specifications)  and  that  there  are  no 

hidden services (electricity, gas, or water) 

below the surface of the wall.

5.  Before installation

5.1 Installation regulations

WARNING

Installation of the  product must be carried 

out by a qualified engineer in accordance 

with prevailing and national regulations as 

listed below.

 

`

Building Regulations

 

`

The Building Standards (Scotland)

 

`

The Building Regulations 

(Northern Ireland)

 

`

I.E.E Electrical Regs

 

`

UK Water Regulations

5.2 Installation requirements

Water supply

In an unvented system the pressure and flowrate is 

directly related to the incoming water supply. For this 

reason it is recommended that the maximum water 

demand is assessed and the water supply checked 

to ensure this demand can be satisfactorily met.

 

`

We suggest the minimum supply requirements 

should be 0.08MPa (0.8 bar) pressure.

 

`

A 15mm cold water supply is recommended.

 

`

The higher the available pressure and flow rate 

the better the system performance.

 

`

The water supply must be of wholesome water 

quality (Fluid Category 1 as defined by the Water 

Supply Regulations 1999).

Outlet/terminal fittings (taps,etc.)

 

`

The product can be used with most types of 

terminal fittings.

 

`

All fittings, pipework and connections must have 

a rated pressure of at least 8 bar at 80°C. 

Summary of Contents for Multipoint 10 and 15 litre

Page 1: ...Multipoint 10 and 15 litre Fitting Instructions...

Page 2: ...cise warranty details to customers Contents 1 Introduction 3 1 1 General 3 1 2 Symbols used 3 1 3 Abbreviations 3 1 4 Liabilities 3 2 Safety 4 2 1 General safety warnings 4 2 2 Recommendations 4 2 3 S...

Page 3: ...in product quality All the specifications stated in this document are therefore subject to change without notice Our liability as the manufacturer may not be invoked in the following cases Failure to...

Page 4: ...in any circumstance 2 Safety 2 1 General safety warnings DANGER This product is unvented and as such becomes pressurised when in operation The combination of pressurisation and hot water could lead t...

Page 5: ...maintained and disposed of at end of life See Section 3 11 Electrical rating 3kW 240V 2 75kW 230V 4 5kW 240V 4 1kW 230V Capacities 10 or 15 litres Weight full 10 litre 16 9kg 15 litre 23 8kg Rated pr...

Page 6: ...relief valve Pressure relief expansion valve Note If pressure reducing valve is used expansion down the mains is not possible Pressure relief expansion valve Pressure relief expansion valve Expansion...

Page 7: ...gineer in accordance with prevailing and national regulations as listed below Building Regulations The Building Standards Scotland The Building Regulations Northern Ireland I E E Electrical Regs UK Wa...

Page 8: ...environment The pipe from the valves to the tundish should be 15mm o dia minimum From the tundish to the point of discharge the pipe should be 22mm o dia minimum and have a resistance to flow equivale...

Page 9: ...t be earthed It is suitable for a c supply only Disconnect the electrical supply before removing the terminal cover Installation must be in accordance with the current I E E Wiring Regulations The pro...

Page 10: ...l After filling the installation with water in the previous section please follow the following steps to complete the installation of the product WARNING DO NOT switch on the product until it has been...

Page 11: ...d when using in conjunction with a Thermostatic Blending Valve position To lock the thermostat position the instructions given under Sections 4 2 3 or 4 2 4 should be followed We recommend that this p...

Page 12: ...y by unscrewing the five securing screws a tapped jacking point is provided Remove any loose scale from the container Carefully clean off any scale from the element and thermostat pocket DO NOT clean...

Page 13: ...relief valve intermittently A Expansion in mains not possible A Fit pack U2 see important installation points B Mains pressure exceeds 0 41 MPa 4 1 bar B Fit packs U1 and U2 C Pack U1 fitted without...

Page 14: ...oduct is manufactured from many recyclable materials At the end of its useful life it should be disposed of at a Local Authority Recycling Centre to realise the full environmental benefits Insulation...

Page 15: ...hin 60 days of installation the user completes and returns the certificate supplied along with proof of purchase to register the product The product is not covered against damage by frost and the imme...

Page 16: ...sponsibility and sustainability charters and reduce our printed material we encourage you to download product brochures from our website In designing these files we have taken into account the need to...

Reviews: