![Heatrae Sadia Multipoint 10 and 15 litre Fitting Instructions Manual Download Page 2](http://html1.mh-extra.com/html/heatrae-sadia/multipoint-10-and-15-litre/multipoint-10-and-15-litre_fitting-instructions-manual_2117696002.webp)
This product can be used by children aged from 8 years and above and
persons with reduced physical sensory or mental capabilities or lack
of experience and knowledge if they have been given supervision or
instruction concerning use of the product in a safe way and understand
the hazards involved. Children shall not play with the product. Cleaning
and user maintenance shall not be made by children without supervision.
Children must be supervised to ensure they do not play with the product.
The HWA Charter Statement requires that all members adhere to the following:
`
To supply fit for purpose products clearly and honestly described.
`
To supply products that meet, or exceed appropriate standards and building and water regulations.
`
To provide pre and post sales technical support.
`
To provide clear and concise warranty details to customers.
Contents
1. Introduction ..................................................3
1.1 General ..................................................3
1.2 Symbols used .........................................3
1.3 Abbreviations ..........................................3
1.4 Liabilities ................................................3
2. Safety ............................................................4
2.1 General safety warnings ........................4
2.2 Recommendations .................................4
2.3 Specific safety instructions
.....................4
3. Technical specification
...............................5
3.1 Technical data ........................................5
3.2 Dimensions and connections .................5
3.3 Electrical diagram(s) ..............................5
4. Description of the product ..........................6
4.1 General description ................................6
4.2 Operation principle .................................6
4.3 Standard delivery ...................................6
4.4 Mains connections .................................6
5. Before installation .......................................7
5.1 Installation regulations ...........................7
5.2 Installation requirements ........................7
5.3 Choice of location ...................................7
6. Installation ....................................................8
6.1 General ..................................................8
6.2 Water connections ..................................8
6.3 Electrical connections ............................9
7. Commissioning ............................................10
7.1 General ..................................................10
7.2 Checklist before commissioning .............10
7.3 Commissioning procedure .....................10
8. Operation ......................................................11
8.1 General ..................................................11
9. Maintenance .................................................12
9.1 General ..................................................12
9.2 Standard inspection & maintenance
operations ............................................. 12
10. Troubleshooting ........................................13
10.1 Fault finding
..........................................13
11. Decommissioning procedure ..................14
12. Spare parts ................................................14
Accessories......................................................15
Warranty ...........................................................15