Heatilator • HEIR36, HEIR42, HEIR50 Installation Manual • 2285-980 Rev. G • 12/14
28
Figure 5.6 Heat Zone Cover Plate
HEAT ZONE
®
LOCATION
LEFT AND RIGHT SIDES
E. Installing the Optional Heat-Zone
®
Gas
Kit
• Locate the Heat-Zone
®
ports on the left and right sides of
the appliance. See Figure 5.6. Remove the knockouts
from the appliance with a tin snips.
• Center the duct collar around the exposed hole and
attach it to the appliance with 3 screws. Note: Do this
BEFORE
fi
nal positioning of the appliance.
• Determine the location for the air register/fan housing
assembly.
Reference the Heat-Zone
®
Gas Kit instructions for the
remaining installation steps.