13
CHAPTER TWO
Periodic Test
1. Every thirty (30) days the ODORATOR 2 should be operated with the power switch on
and while
not
hooked up to a gas supply.
2. Wait about 30 seconds and then position the nose approximately 3/4 inch (20 mm)
above the exhaust port and sniff the exhaust.
3. If no odor is detected, turn the ODORATOR 2
“OFF”. The ODORATOR 2 has not
absorbed the odorant and is usable.
4. If an odor is detected, turn the ODORATOR 2
“OFF” and send it to the nearest Heath
Repair Center (Regional Office) listed on page 21. The odor is an indication that the
ODORATOR 2 has absorbed the odorant and must have its internal tubing replaced
and gas flow components cleaned.
The forms on pages 16 and 17 are provided to document the Periodic Tests as a courtesy
only. Y o u r Company
’s procedures will define how records are kept and in what format.
Calibration
For regulatory compliance, instrument calibration and maintenance a factory
calibration is recommended every 12 but not more than 15 months from the date of the
previous factory calibration.
The ODORATOR 2 will default to automatically start alerting the
operator 30 days from the actual annual calibration due date. The operator must acknowledge
the alert by pressing the “ * “ key. An OdorSeer administrator can configure an earlier date if
desired. Refer to the OdorSeer manual for more details. Only Heath factory or factory trained
personnel should perform ODORATOR 2 calibration. Factory recognized labels and seals
maintain warranty.
Refer to page 21 for Heath repair and calibration centers.