
87
CENTER
CENTER
PARTS REQUIRED:
DOORS
BEGIN
1
Center trim
ZJ
over doors and secure with (7) 2" finishing nails into framing as shown.
2
Install trim
AH
,
AHL
and
AHR
as shown. Level
AH
before installing.
Fasten trim to each door from inside with (11) 3/4" screws
(Fig. A, Fig B)
.
Your door trim and metal threshold are now installed.
FINISH
Fig. B
3/4"
(1,9 cm)
Screws
AHR
AHL
AHR
AHL
AH
AH
ZJ
3/4" (1,9 cm)
x11
Bagged separately/
special coating
x1
AHL
19/32" x 2-1/2" x 62" (1,5 x 6,3 x 157,5 cm)
x1
AHR
19/32" x 2-1/2" x 62" (1,5 x 6,3 x 157,5 cm)
19/32" x 2-1/2" x 26 5/8" (1,5 x 6,3 x 67,6 cm)
AH
x2
x1
ZJ
19/32" x 2-1/2" x 72" (1,5 x 7,6 x 182,9 cm)
Install 64" metal threshold with (11) 3/4" screws.
3
3/4" (1,9 cm)
x62
x1
64" Metal Threshold
(11) Special Coating Screws
2"
(5,1 cm)
Finishing Nails
2" (5,1 cm)
x7