background image

79

1-3/4"

(4,4 cm)

1-3/4"
(4,4 cm)

TP

TP

TP

Flush

Flush

Flush

SP

2

3

Assemble joist with 3" nails in a staggered pattern. 

Turn assembled joist over and repeat staggered nail pattern.

Repeat steps to build a second loft joist.

Support joist and drill a 7/16" hole through each end 

(Fig. A)

.

PARTS REQUIRED:

LOFT JOISTS

x28

3" (7,6 cm) 

x2

2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)

TP

7/16" (11 mm) Drill Bit

Orient parts 

TP

 and 

SP

 on a flat surface.

 

Hold parts 

TP

 and 

SP

 flush and aligned.

BEGIN

¸

1

Fig. A

Flush

3" 

(7,6 cm)

Nails

2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 

x2

SP

Summary of Contents for VALUE Series

Page 1: ...AM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based on number of completed installations Call a Recruiter Today 734 365 7000 visit us online at help backyardproducts com AVOID THE WAIT Submit a help request Answers to frequently asked questions Live c...

Page 2: ...DC Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and official rules visit https backyardreviews net sweepstakes rules Scan QR code above Click write a review Find your product Tell us what you think Submit your review You ll be notified by e mail if you ...

Page 3: ... materials to level your shed are listed on page 10 CHECK ALL PARTS Inventory all parts listed on pages 5 8 ADDITIONAL MATERIALS You will need additional materials to complete your shed See pages 3 4 for required and optional materials and quantities CONTACT OUR CUSTOMER SERVICE TEAM IF ANY PARTS ARE MISSING OR DAMAGED Order form and warranty at back of manual Call 1 877 743 3400 email customerser...

Page 4: ...bly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk Gun Ham...

Page 5: ... x 4 x 12 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10 2 x 297 2 cm 3 7 6 cm hot dipped galvanized nails 2 x 4 x 12 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10 2 x 297 2 cm 2 x 4 x 12 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10 2 x 297 2 cm 2 x 4 x 12 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10 2 x 297 2 cm 3 7 6 cm...

Page 6: ...ed Drip Edge Feet 15 Roofing Felt Sq ft to cover 1 Galvanized Roofing Nails lbs For roofing felt 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm x2 x2 x2 x3 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm x5...

Page 7: ... Board Size Actual Size 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x 2 1 2 3 8 x 6 3 cm RS RS RS GABLE 12 x 12 PARTS LIST INVENTORY YOUR PARTS before you begin We suggest sorting parts by the category they are listed in 12x12 AHR x1 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm ZJ x1 19 32 x 2 1 2 x 72 1 5 x 6 3 x 182 9 cm OO x2 69 175 3 cm...

Page 8: ...92 7 x 121 6 cm Loft and shalf panels are 7 16 1 1 cm thick x1 23 7 8 x 40 7 8 60 6 x 103 8 cm LOFT SHELF PARTS LIST x1 23 7 8 x 96 60 6 x 243 8 cm 2 x 3 x 96 5 1 x 7 6 x 243 8 cm x1 PT 2 x 4 x 96 5 1 x 10 2 x 243 8 cm x2 TP 2 x 3 x 48 5 1 x 7 6 x 121 9 cm x1 NK 2 x 4 x 48 5 1 x 10 2 x 121 9 cm x2 SP 3 8 x 8 x 12 1 2 1 x 20 3 x 32 cm x14 7 16 x 11 7 8 x 48 1 1 x 30 2 x 121 9 cm x2 7 16 x 11 7 8 x ...

Page 9: ... 1 cm x6 BOXES x6 BOXES NOTE If you are using a nail gun nails may be used where screws are shown for quicker assembly Length of nail must match screw length 1 1 2 3 8 cm x85 x4 3 8 LOFT HDW SET 5 1 2 Hex bolt 2 flat washers lock nut x2 Other HARDWARE Not Actual Size 3 4 1 9 cm x8 x1 1 1 2 3 8 cm x2 x1 x2 x2 64 Metal Threshold x1 Window 3 4 1 9 cm x11 Bagged separately special coating ...

Page 10: ...RS ROOF PANELS ROOF PANELS HARDWARE HARDWARE 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x6 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x4 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x8 x4 x8 2 x 4 x 96 5 1 x 10 2 x 243 9 cm TP x2 2 x 4 x 96 5 1 x 10 2 x 243 9 cm TP x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x2 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x4 7 16 x 47 7 8 x 48 1 1 x 6 x 121 9 cm x2 7 16 x 48 x 96 1 1 x 121 9 x ...

Page 11: ...87 7 cm 12 x20 304 8 x 609 6 cm 12 x24 304 8 x 731 5 cm 144 365 8 cm 203 5 8 612 3 cm 192 487 7 cm 240 609 6 cm 288 619 8 cm 240 609 6 cm 279 7 8 710 6 cm 322 817 9 cm 12 x 12 Building Requires 12 x 16 Building Requires 12 x 20 Building Requires 12 x 24 Building Requires 2 x 4 x 12 5 1 x 10 2 x 304 8 cm x2 2 x 4 x 12 5 1 x 10 2 x 304 8 cm x2 2 x 4 x 12 5 1 x 10 2 x 304 8 cm x2 2 x 4 x 12 5 1 x 10 ...

Page 12: ...G METHODS MATERIAL REQUIRED TREATED LUMBER 4 x 4 x 12 10 2 x 10 2 x 304 8 cm 3 4 x 4 x 16 10 2 x 10 2 x 487 7 cm and 3 4 x 4 x 16 10 2 x 10 2 x 487 7 cm and 1 4 x 4 x 12 10 2 x 10 2 x 144 cm cut to 3 48 121 9 cm 3 4 x 4 x 8 10 2 x 10 2 x 243 8 cm 4 x 4 x 16 10 2 x 10 2 x 487 7 cm x3 x3 Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame se...

Page 13: ...r at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at the ends of each runner ensuring that the frame remains square Fasten the frame to the 4x4 runners with 2 3 screws at each connection Fig A 2 BEGIN 1 Use a level and ensure the frame is level before applying floor panels Check for frame squareness by measuring diagonally across the corner...

Page 14: ...tion Organize your assembly procedure during the build process to avoid over handling of the walls HINT D O O R EAVE WALL EAVE WALL EAVE WALL GABLE WALL GABLE WALL NOTE 12 x 12 Gable shown standard throughout manual Ensure the floor frame is level after installing floor panels Re level if needed ...

Page 15: ...12 x 16 shed go to page 33 for wall installation 12 x 24 After assembling the walls for your 12 x 24 shed go to page 45 for wall installation 12 x 12 Wall 01 Page 16 Wall 02 Page 18 Wall 03 Page 20 Build 2 eave walls 12 x 20 Wall 01 Page 16 Wall 02 Page 18 Wall 05 Page 24 Build 2 eave walls 12 x 16 Wall 01 Page 16 Wall 02 Page 18 Wall 04 Page 22 Build 2 eave walls 12 x 24 Wall 01 Page 16 Wall 02 P...

Page 16: ...e 1 AM and OSB end to end on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN 1 AM AM 2 Flip header assembly over and nail as shown on the other side Flush Flush Assemble this door header before building any walls ...

Page 17: ...pposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Block x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm For squareness maintain 3 4 and 1 1 2 measurement along panel edge BEGIN HERE 3 4 1 9 cm 6 15 2 cm 12 30 5 cm 2x3 TEMP SPACER 3 4 GAUGE BLOCK GAA WALL PANEL INSTALLATION HINTS E...

Page 18: ... 2 x 199 4 cm AI TP UM UM TP SP SP AI x6 AL x5 Flush Flush Flush Flush Flush Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as shown Fig A Secure with 2 3 nails at each connection and 4 3 nails at seams Fasten 3 middle parts AL to Pre Assembled Header with 2 3 screws Fig B Fasten 2 end AL to studs AI with 4 3 nails at eac...

Page 19: ...cm x166 x1 x1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw 3 4 1 9 cm x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 11 7 8 x 84 panels flush to installed panels and 1 1 2 from the top plate Secure panels with 2 nails spaced 6 apart on edges Note the panel lip edge square edge orientation Flush Flus...

Page 20: ... cm PARTS REQUIRED x32 x7 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI AI x7 SP TP SP TP 1 BEGIN Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams HINT Flush Flush Flush Flush Seam Seam 3 7 6 cm Nails x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP ...

Page 21: ...nel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 2 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation...

Page 22: ...35 cm TJ x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC PARTS REQUIRED YFA HVC TJ AI x5 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 12 EAVE WALL 03 3 7 6 cm x48 x5 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI Seam HINT Seam 3 7 6 cm Nails 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x2 YFA Build two identical walls ...

Page 23: ...ote the panel lip edge square edge orientation 2 Install next 2 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 3 48 x 84 121 9 x 213 4 cm x3 2x3 2x3 3 1 2 8 9 cm 6 15 2 cm 12 30 5 cm 1 1 2 3 8 cm Flush Flush Flush Flush SQUARE EDGE SQUARE EDGE 23 7 8 60 6...

Page 24: ...edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 16 EAVE WALL 04 3 7 6 cm x72 PARTS REQUIRED Build two identical walls AI x7 TJ SP SP YFA YFA HVC Seam Seam Seam 3 7 6 cm Nails Seam x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC 2 x 4 x 68 1 2 5 1 x 10 2 x 17...

Page 25: ...apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 3 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation 3 2x3 2x3 6 15 2 cm Flush Flush Flush Flush Flush Flush SQUARE EDGE SQUARE EDGE SQUARE EDGE 1 1 2 3 8 cm 3 ...

Page 26: ... Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 20 EAVE WALL 05 3 7 6 cm x88 PARTS REQUIRED Build two identical walls AI x9 TJ TP TP YFA YFA HVC Seam Seam Seam 3 7 6 cm Nails Seam x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x2 x9 2 x 4 x...

Page 27: ...es and 12 inside panel Note the panel lip edge square edge orientation 2 Install 4 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation 3 2x3 2x3 6 15 2 cm Flush Flush Flush Flush Flush Flush Flush Flush SQUARE EDGE SQUARE EDGE SQUARE EDGE SQUARE EDGE 1 1...

Page 28: ... Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 24 EAVE WALL 06 3 7 6 cm x112 PARTS REQUIRED Build two identical walls AI x11 SP TP TP SP TJ YFA YFA HVC Seam Seam Seam Seam Seam 3 7 6 cm Nails Seam x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm...

Page 29: ...sh Flush Flush Flush Flush Flush Flush SQUARE EDGE SQUARE EDGE SQUARE EDGE SQUARE EDGE SQUARE EDGE 1 1 2 3 8 cm 3 1 2 8 9 cm Install 1 48 x 84 panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 5 48 x 84 panels flush to installed panels Locate pane...

Page 30: ...imension 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floor with 3 nails Fig A 2 Your 12 gable wall 02 is now standing FINISH Use OO as a temporary brace Secure with 2 3 screws 6 15 2 cm D O O R D O O R Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails ...

Page 31: ...t Angle nails into floor frame Fig C Nail panel to 12 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st 12 eave wall is now installed FINISH 2 5 1 cm x27 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 1 1 2 3 8 cm Nails 2 5 1 cm Nails Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig C Secure wall t...

Page 32: ... frame with 2 nails spaced 6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 6 15 2 cm Secure wall with 1 2 screw through eave wall panel into 12 gable wall bottom and top plates Fig B Fig A Secure wall to bottom plate first ENSURE PANEL CORNERS ARE FLUSH 2 BEGIN 1 Place 2nd 12 eave wall centered on fl...

Page 33: ...floor frame Fig C Nail panels to 24 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig A Secure wall top plates with 3 screws ...

Page 34: ...m SP x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT DOOR Ensure all doubler seams are non aligned over seams of wall top plates HVC TJ TJ SP PT SP PT 3 7 6 cm Nails HVC CONTINUE TO PAGE 51 TO RESUME CONSTRUCTION OF 12 X 12 SHED 1 BEGIN Orient parts on top of wall frames Measure and mark from end of boards Secure from top with 2 3 nails spaced every 24 Fig A 2 Se...

Page 35: ...nsion 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floor with 3 nails Fig A 2 Your 12 gable wall 02 is now standing FINISH Use OO as a temporary brace Secure with 2 3 screws 6 15 2 cm D O O R D O O R Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig...

Page 36: ...Angle nails into floor frame Fig C Nail panel to 12 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st 16 eave wall is now installed FINISH 2 5 1 cm x36 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Secure wall top plate with 1 3 screw at the corner at an angle as show...

Page 37: ... 2nd 16 wall centered on floor The 1 1 2 3 8 cm overlap is to the top Use TJ as a temporary brace as shown Secure TJ with 2 3 screws TJ x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ Temporary Brace 1 1 2 3 8 cm 3 7 6 cm x2 3 7 6 cm x16 2 5 1 cm x36 3 Nail lower edge of wall panels to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nai...

Page 38: ...4 Nail 16 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Your 2nd 16 wall is now installed FINISH 1 1 2 3 8 cm x13 Secure gable wall top plate with 1 3 screw at the corner at an angle as shown Fig D 5 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D ...

Page 39: ... C Nail panels to 24 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails 6 15 2 cm 6 15 2 cm Secure wall top plates with 3 screws at each corner at an angle Fig D 3 3 7 6 cm Scre...

Page 40: ... every 24 Fig A 2 Secure from bottom with 2 3 screws at each corner Fig B Fig B 3 7 6 cm Screws Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ 2 x 4 x 48 5 1 x 10 2 x 121 9 cm NK x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT DOOR Ensure all doubler seams are non aligned over seams of wall top plates SP SP SP SP TJ PT PT 3 7 6 cm Nails TJ HVC HVC Nail TYP 24 61 ...

Page 41: ...nsion 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floor with 3 nails Fig A 2 Your 12 gable wall 02 is now standing FINISH Use OO as a temporary brace Secure with 2 3 screws 6 15 2 cm D O O R D O O R Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig...

Page 42: ...ngle nails into floor frame Fig C Secure panel to 12 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st 20 eave wall is now installed FINISH 2 5 1 cm x45 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Secure wall top plate with 1 3 screw at the corner at an angle as sho...

Page 43: ...oor 1 1 2 3 8 cm overlap is to the top Use TJ as a temporary brace as shown Secure TJ with 2 3 screws TJ 3 7 6 cm Screws 3 7 6 cm x2 x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ Temporary Brace 1 1 2 3 8 cm 3 7 6 cm x20 2 5 1 cm x45 Nail 2 nails first 2 5 1 cm Nails Fig C 3 7 6 cm Nails 3 7 6 cm Nails 3 Nail lower edge of wall panels to floor frame with 2 nails spaced 6 apart Angle nails into floor fr...

Page 44: ...1 4 Secure 20 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Your 2nd 20 wall is now installed FINISH 1 1 2 3 8 cm x13 Secure wall top plate with 1 3 screw at the corner at an angle as shown Fig D 5 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D ...

Page 45: ... C Nail panels to 24 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails 6 15 2 cm 6 15 2 cm Secure wall top plates with 3 screws at each corner at an angle Fig D 3 3 7 6 cm Scre...

Page 46: ... spaced every 24 Fig A Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT DOOR Ensure all doubler seams are non aligned over seams of wall top plates SP SP TJ PT PT PT PT 3 7 6 cm Nails TJ HVC HVC Nail TYP 24 61 cm Your wall doublers are now installed FINISH CONTINUE TO PAGE 51 TO RES...

Page 47: ...nsion 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floor with 3 nails Fig A 2 Your 12 gable wall 02 is now standing FINISH Use OO as a temporary brace Secure with 2 3 screws 6 15 2 cm D O O R D O O R Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig...

Page 48: ...into 12 wall bottom plate Fig A and top plate Fig B Secure wall to bottom plate first BEGIN 1 ENSURE PANEL CORNERS ARE FLUSH Your 1st 24 eave wall is now installed FINISH 2 5 1 cm x54 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Secure wall top plate with 1 3 screw at the corner at an angle as show...

Page 49: ...r The 1 1 2 3 8 cm overlap is to the top Use TJ as a temporary brace as shown Secure TJ with 2 3 screws TJ 3 7 6 cm Screws 3 7 6 cm x4 x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ Temporary Brace 1 1 2 3 8 cm 3 7 6 cm x24 2 5 1 cm x54 Nail 2 nails first 2 5 1 cm Nails Fig C 3 7 6 cm Nails 3 7 6 cm Nails 3 Nail lower edge of wall panels to floor frame with 2 nails spaced 6 apart Angle nails into floor ...

Page 50: ...1 4 Secure 24 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Your 2nd 24 wall is now installed FINISH 1 1 2 3 8 cm x13 Secure wall top plate with 1 3 screw at the corner at an angle as shown Fig D 5 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D ...

Page 51: ... C Nail panels to 24 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails 6 15 2 cm 6 15 2 cm Secure wall top plates with 3 screws at each corner at an angle Fig D 3 3 7 6 cm Scre...

Page 52: ...from top with 2 3 nails spaced every 24 Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT DOOR Ensure all doubler seams are non aligned over seams of wall top plates SP SP SP SP TJ PT PT PT PT Fig A Fig B 3 7 6 cm Nails 3 7 6 cm Screws TJ HVC HVC Nail TYP 24 61 cm Your wall doublers are now installed FINISH CONTINUE TO...

Page 53: ... REQUIRED x192 x288 x144 x240 x18 x26 x14 x22 6 x 24 15 2 x 60 9 cm 2 GUSSET RAFTERS Temporary Support 2 x 4 x 24 5 1 x 10 2 x 61 cm x1 RL 3 7 6 cm x2 x16 x24 x12 x20 12x12 12x16 12x20 12x24 x7 x11 x5 x9 12x12 12x16 12x20 12x24 1 GUSSET RAFTERS x2 Place two rafter halves on floor and flush in the corners of wall and RL as shown in STEP 1 Flush rafters at peak Secure gusset to rafters with 2 nails ...

Page 54: ...S DIMENSIONS TO CENTER OF RAFTERS DIMENSIONS TO CENTER OF RAFTERS Check that you have the measurements shown Secure rafters with 2 3 screws angled at each end Fig A Fig B Secure rafters on opposite side 1 BEGIN x7 12x16 x36 x5 12x12 x28 Fig A 3 7 6 cm Screws angled into top plate Fig A 3 7 6 cm Screws angled into top plate Flush to inside of panel Fig B Flush to inside of panel Fig B 12 x 12 12 x ...

Page 55: ...Your rafters are now installed BEGIN 3 7 6 cm x11 12x24 x52 x9 12x20 x44 12 x 20 12 x 24 2 Gusset Preassembled 1 Gusset Preassembled ALIGN OVER STUDS ALIGN OVER STUDS DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS DIMENSIONS TO CENTER OF RAFTERS DIMENSIONS TO CENTER OF RAFTERS Flush to outside of panel Flush to outside of panel Flush to outside of panel Flush...

Page 56: ...d right panels on AF flush to middle panel Secure panel with 1 1 2 nails spaced 6 apart along edge Repeat steps to assemble the 2nd gable unit Install gable panels with the primed side facing up Your 2 gable units are now assembled FINISH 6 15 2 cm Flush Flush 2 9 16 6 5 cm 2 9 16 6 5 cm 1 3 4 4 4 cm 1 3 4 4 4 cm Window hole of front panel Flush Flush Mark 144 365 8 cm 1 BEGIN AF AF 1 1 2 3 8 cm x...

Page 57: ...16 6 5 cm Measure and Mark Continue nailing lower edge of panels to wall doubler with 2 nails spaced 6 apart Working inside secure gable unit with 2 3 screws angled into each AF at an angle Fig A Secure gable panels to rafter with with 2 nails spaced 6 apart Measure 2 9 16 6 5 cm down from top plate doubler and mark at each side as shown Set gable unit on top plate Fasten with 1 2 nail on each sid...

Page 58: ...s a lever move the panel side to side until the top corner is flush to the peak Fig B and there is a 1 2 measurement on the gable end rafter Fig C Secure panel with 2 2 nails in the corners 2 Place the 48 x 96 panel on rafters with a 3 4 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with 2 2 nails in the corners 48 x 96 3 4 1 9 cm Fig A Gauge Block BEGIN 1 Flus...

Page 59: ...er of the rafters Secure panels with 1 2 nail into each rafter 47 7 8 x 48 121 6 x 121 9 cm x1 Install a 23 7 8 x 48 roof panel flush to the installed panel and flush at peak Fig B Secure panel with 1 2 nail in each corner Move the gable end rafter edge until it is 1 2 from the 23 7 8 x 48 roof panel Fig C Finish securing panel with 1 2 nail in each corner 3 4 2 5 1 cm Nails Fig D NOTE Measurement...

Page 60: ... 2 x 47 7 8 91 7 x 121 9 cm 2 5 1 cm Nails 36 1 2 x 96 36 1 2 x 47 7 8 Flush Flush Flush Next install 36 1 2 x 47 7 8 and 36 1 2 x 96 roof panels with a 3 4 measurement on the rafter Fig A and flush to the installed panels Fig E Secure panels with 1 2 nail in each corner 3 4 1 9 cm Fig A Gauge Block ...

Page 61: ... installed Repeat all steps to install roof panels on the opposite side FINISH Secure all roof panels with 2 nails spaced 6 apart and 12 apart inside panels 7 PARTS REQUIRED 12 x 12 ROOF PANELS 2 5 1 cm x168 6 15 2 cm 12 30 5 cm ...

Page 62: ...er move the panel side to side until the top corner is flush to the peak Fig B Move gable end rafter edge until it is 1 2 from the panel Fig C Secure panel with 1 2 nail in each corner 2 Place the 48 x 96 panel on rafters with a 3 4 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with 1 2 nail in each corner 48 x 96 Flush at peak Fig B BEGIN 1 3 4 1 9 cm Gauge Bl...

Page 63: ...he installed panel and flush at the peak Fig B Secure panel with 1 2 nail in each corner Move gable end rafter edge until it is 1 2 from the 2nd 48 x 48 roof panel Fig C Finish securing panel with 1 2 nail in each corner 3 4 5 PARTS REQUIRED 12 x 16 ROOF PANELS x18 2 5 1 cm Fig D Maintain spacing between the center of the rafters at the lower edge of the panels Fig D Secure panels with 1 2 nail in...

Page 64: ...Secure panels with 1 2 nail in each corner Next install 36 1 2 x 96 with a 3 4 measurement on the rafter Fig A and flush to the installed panels Secure panel with 1 2 nail in each corner 2 5 1 cm Nails 36 1 2 x 96 36 1 2 x 47 7 8 36 1 2 x 47 7 8 3 4 1 9 cm Fig A Gauge Block Flush Flush Flush Flush Flush x1 36 1 2 x 96 60 692 7 x2 36 1 2 x 47 7 8 91 7 x 121 9 cm ...

Page 65: ... installed Repeat all steps to install roof panels on the opposite side FINISH Secure all roof panels with 2 nails spaced 6 apart and 12 apart inside panels 8 PARTS REQUIRED 12 x 16 ROOF PANELS 2 5 1 cm 6 15 2 cm 12 30 5 cm x236 ...

Page 66: ...er move the panel side to side until the top corner is flush to the peak Fig B Move gable end rafter edge until it is 1 2 from the panel Fig C Secure panel with 1 2 nail in each corner 2 Place the 48 x 96 panel on rafters with a 3 4 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with 1 2 nail in each corner 48 x 96 Flush at peak Fig B BEGIN 1 3 4 1 9 cm Gauge Bl...

Page 67: ... the peak Fig B Secure panel with 1 2 nail in each corner Move gable end rafter edge until it is 1 2 from the roof panel Fig C Finish securing panel with 1 2 nail in each corner 3 4 5 PARTS REQUIRED 12 x 20 ROOF PANELS x22 2 5 1 cm Fig D Maintain spacing between the center of the rafters at the lower edge of the panels Fig D Secure panels with 1 2 nail into each rafter as shown Move to the top of ...

Page 68: ...led panels Secure panels with 1 2 nail in each corner Next install 36 1 2 x 96 roof panel with a 3 4 measurement on the rafter Fig A Secure panel with 1 2 nail in each corner 36 1 2 x 96 36 1 2 x 47 7 8 36 1 2 x 96 3 4 1 9 cm Fig A Gauge Block Flush Flush Flush Flush Flush 2 5 1 cm Nails x1 36 1 2 x 96 60 692 7 x2 36 1 2 x 47 7 8 91 7 x 121 9 cm ...

Page 69: ... installed Repeat all steps to install roof panels on the opposite side FINISH Secure all roof panels with 2 nails spaced 6 apart and 12 apart inside panels 8 PARTS REQUIRED 12 x 20 ROOF PANELS 2 5 1 cm 6 15 2 cm 12 30 5 cm x268 ...

Page 70: ...er move the panel side to side until the top corner is flush to the peak Fig B Move gable end rafter edge until it is 1 2 from the panel Fig C Secure panel with 1 2 nail in each corner 2 Place the 48 x 96 panel on rafters with a 3 4 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with 1 2 nail in each corner 48 x 96 Flush at peak Fig B BEGIN 1 3 4 1 9 cm Gauge Bl...

Page 71: ...e peak Fig B and there is a 3 4 measurement on the rafter Fig A Finish securing panel with 1 2 nail in each corner Install 47 7 8 x 48 roof panel flush to the installed panel and flush at the peak Fig B Secure panel with 1 2 nail in each corner Move gable end rafter edge until it is 1 2 from the 2nd 48 x 48 roof panel Fig C Finish securing panel with 1 2 nail in each corner 3 4 6 5 PARTS REQUIRED ...

Page 72: ...panels flush to the installed panels Secure panels with 1 2 nail in each corner Install 1 36 1 2 x 96 roof panels with a 3 4 measurement on the rafter at each side Fig A and flush to the installed panels Secure panels with 1 2 nail in each corner 36 1 2 x 96 36 1 2 x 96 36 1 2 x 47 7 8 36 1 2 x 47 7 8 3 4 1 9 cm Fig A Gauge Block Flush Flush Flush Flush Flush Flush Flush 2 5 1 cm Nails x1 36 1 2 x...

Page 73: ... installed Repeat all steps to install roof panels on the opposite side FINISH Secure all roof panels with 2 nails spaced 6 apart and 12 apart inside panels 9 PARTS REQUIRED 12 x 24 ROOF PANELS 2 5 1 cm 6 15 2 cm 12 30 5 cm x336 ...

Page 74: ...peat steps to install trim to the opposite gable FINISH Flush Flush Flush Flush at peak Install gable trim CQR and CQL flush to top of roof panel and flush at peak as shown Secure trim with 2 finish nails spaced evenly BEGIN 1 19 32 x 3 1 2 x 84 15 16 1 5 x 8 9 x 215 7 cm x2 CQR 19 32 x 3 1 2 x 84 15 16 1 5 x 8 9 x 215 7 cm x2 CQL ...

Page 75: ...f roof panel Fig A BEGIN Repeat installation on opposite side Screw through roof panel into trim with 1 1 4 screws spaced evenly in a staggered pattern Screw through roof panel into trim with 1 1 4 screws spaced evenly in a staggered pattern Part WTC may need to be trimmed to fit Install WTC flush to edge of roof panel and flush to installed eave trim VX 1 x58 1 1 4 3 2 cm 3 7 6 cm x8 x2 2 x 6 x 4...

Page 76: ...h roof panel into trim with 1 1 4 screws spaced evenly in a staggered pattern Screw through roof panel into trim with 1 1 4 screws spaced evenly in a staggered pattern Last trim piece may need to be trimmed to fit Install VX flush to edge of roof panel and flush to installed eave trim WTC Install VF flush to edge of roof panel and flush to installed eave trim VX 1 x70 1 1 4 3 2 cm 3 7 6 cm x8 96 2...

Page 77: ...staggered pattern Screw through roof panel into trim with 1 1 4 screws spaced evenly in a staggered pattern Screw through roof panel intotrim with 1 1 4 screws spaced evenly in a staggered pattern Last trim piece may need to be trimmed to fit Install VX flush to edge of roof panel and flush to installed eave trim WTC Install 2nd VX flush to edge of roof panel and flush to installed eave trim VX 1 ...

Page 78: ...ew through roof panel into trim with 1 1 4 screws spaced evenly in a staggered pattern Screw through roof panel into trim with 1 1 4 screws spaced evenly in a staggered pattern Last trim piece may need to be trimmed to fit Install VX flush to edge of roof panel and flush to installed eave trim WTC Install 2nd VX flush to edge of roof panel and flush to installed eave trim VX Install VF flush to ed...

Page 79: ...e end 83 1 2 corner trim under gable panel Fig A and flush to eave wall panel Fig B Secure with 2 finishing nails spaced evenly Install eave side 83 1 2 corner trim flush to eave soffit and flush along seam of installed corner trim Fig C Secure with 2 finishing nails spaced evenly 2 Flush to eave panel PARTS REQUIRED CORNER TRIM x64 2 5 1 cm BEGIN 1 3 8 x 1 3 4 x 83 1 2 1 x 4 5 x 212 1cm x8 Fig C ...

Page 80: ...NISH Your collar tie s are now installed 3 7 6 cm 1 BEGIN 2nd 2nd 2nd 2nd 4th 4th 4th 6th 6th 8th HINT For best appearance install collar ties on back side of rafter Fig A PARTS REQUIRED COLLAR TIE INSTALLATION x12 x24 x6 x18 x2 x4 x1 x3 12x12 12x16 12x20 12x24 Flush to roof panel DOOR WALL DOOR WALL DOOR WALL DOOR WALL 3 7 6 cm Nails 12 x 12 12 x 16 12 x 20 12 x 24 2 x 4 x 96 5 1 x 10 2 x 243 9 c...

Page 81: ...il pattern Repeat steps to build a second loft joist Support joist and drill a 7 16 hole through each end Fig A PARTS REQUIRED LOFT JOISTS x28 3 7 6 cm x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 7 16 11 mm Drill Bit Orient parts TP and SP on a flat surface Hold parts TP and SP flush and aligned BEGIN 1 Fig A Flush 3 7 6 cm Nails 2 x 4 x 48 5 1 x 10 2 x 121 9 cm x2 SP ...

Page 82: ...sh to bottom of top plate and flush at seam Secure with 2 3 nails at wall studs and 4 3 nails at seam 2 3 Clamp or hold joist assembly in place flush to top plate and flush against wall stud Drill through wall stud with 7 16 drill bit using hole in joist assembly as a guide Line up holes of joist assembly with holes in studs Secure joist with hex bolts flat washers and lock nuts at both sides Fig ...

Page 83: ...t panels centered over loft joists and ledger board Secure with 2 nails spaced 8 20 cm apart NOTE There will be a gap of approximately 1 2 13 mm on either side of installed deck panels x1 x1 23 7 8 x 40 7 8 60 6 x 103 8 cm 23 7 8 x 96 60 6 x 244 cm x34 2 5 1 cm Flush 2 5 1 cm Nails 8 20 cm 8 20 cm ...

Page 84: ...tall shelf supports at shown heights from floor and flush to wall studs of wall opposite door Secure with 3 2 nails 1 2 Flush Flush AC Right Left Flush Flush 60 1 2 153 7 cm 44 1 2 113 cm FLOOR Right Shelf Bracket x4 x84 2 5 1 cm 2 5 1 cm Nails 2 5 1 cm Nails 2 x 3 x10 5 1 x 7 6 x 25 4 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm AC x14 x14 12 WALL LEVEL LEVEL x4 x10 ...

Page 85: ...f panels and flush at seams Secure with 2 2 nails at each support and 4 2 nails at seams FINISH 3 Your shelves are now installed 4 x64 2 5 1 cm 7 16 x 11 7 8 x 96 OSB 1 1 x 30 2 x 243 8 cm x2 1 x 4 x 96 2 5 x 10 2 x 243 8 cm KP x2 Flush WJ WJ KP KP Flush 2 5 1 cm Nails 96 243 8 cm 96 243 8 cm 48 121 9 cm 48 121 9 cm 7 16 x 11 7 8 x 48 1 1 x 30 2 x 121 9 cm x2 1 x 4 x 48 2 5 x 10 2 x 121 9 cm x2 WJ...

Page 86: ... 4 3 2 cm Screws PARTS REQUIRED x1 x1 Left Door Right Door DOORS 3 7 6 cm x4 1 x 3 x 5 2 5 x 7 6 x 12 7 cm x1 GAA x2 1 1 4 3 2 cm Place doors on flat surface 3 8 offset is to top Look for red right and green left on hinge board Attach temporary supports OO and GAA as shown BEGIN 1 OO x1 69 175 3 cm Door Stiffener ...

Page 87: ...mark 3 8 1 cm Fig B 3 7 6 cm x12 Flush against wall panels Fig A OO 2 3 Screw hinge boards into wall supports with 10 3 screws as shown Make sure screws go into framing 4 Install OO flush under panels Secure to floor frame with 2 3 screws Fig A Mark center of door opening OO x1 69 175 3 cm Door Stiffener 5 3 7 6 cm Screws in door stud 2 3 7 6 cm Screws OO TEMPORARY SUPPORT TEMPORARY SUPPORT ...

Page 88: ...g B OO IT IS IMPORTANT TO HOLD THESE DIMENSIONS 12 30 5 cm Approx BEGIN Center OO vertically on the left door in the doorway Fig A overlapping 1 2 5 cm along the edge of door Fig B Secure with 7 2 screws through outside trim into OO 1 Center OO vertically on the right door in the door opening offset 1 2 5 cm from the edge of door Fig B Secure with 7 2 screws through outside trim into OO 2 2 5 1 cm...

Page 89: ... and metal threshold are now installed FINISH Fig B 3 4 1 9 cm Screws AHR AHL AHR AHL AH AH ZJ 3 4 1 9 cm x11 Bagged separately special coating x1 AHL 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm x1 AHR 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm 19 32 x 2 1 2 x 26 5 8 1 5 x 6 3 x 67 6 cm AH x2 x1 ZJ 19 32 x 2 1 2 x 72 1 5 x 7 6 x 182 9 cm Install 64 metal threshold with 11 3 4 screws 3 3 4 1 9 cm x62 x1 6...

Page 90: ...GIN 1 PARTS REQUIRED DOOR HARDWARE Your decorative door hinges are now installed Install decorative hinges in locations shown Secure with 3 4 screws FINISH 3 4 1 9 cm Screws 3 4 1 9 cm x12 Flush to hinge x4 ...

Page 91: ...om floor Bolt is open when loop is connecting base Fig B Mark and pre drill holes for screws Install bolt with screws supplied Drill 5 16 7 9 mm hole deep enough for bolt to slide into 5 16 7 9 mm drill for bolt 1 2 5 cm deep 5 16 7 9 mm drill for bolt 1 2 5 cm deep 1 2 12 7 mm OPEN POSITION Spring is loose OVER DOOR FRAME FLOOR Loop contacts base Loop contacts base OPEN POSITION Spring is loose 3...

Page 92: ... set screw as shown 5 6 Insert handle in hole and secure with 1 1 4 screws FINISH RIGHT DOOR 1 3 4 4 4 cm TOP VIEW 1 4 Pre drill and 3 8 Drill through x1 x2 1 1 2 3 8 cm Re drill hole with 3 8 drill Keep drilled hole square to trim to avoid breaking edge of door stiffener Measure and mark location of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill Fig A 35 3 4 90 cm 1 3 ...

Page 93: ... EYE PARTS REQUIRED x2 Install hook into framing if possible BEGIN 1 FINISH Swing door open to locate eye Install hooks in wall and into framing behind Fig A You have installed your hook eyes 2 Hook Fig A Eye ...

Page 94: ...ndow 2 5 1 cm x14 EU x2 19 32 x 2 1 2 x 17 1 6 x 7 6 x 43 2 cm DI x2 19 32 x 2 1 2 x 12 1 5 x 6 3 x 30 5 cm Your gable window and trim is now installed FINISH 3 4 Screws 1 9 cm 12 30 5 cm 3 4 1 9 cm 2 5 1 cm Center Center Flush EU x 2 DI x 2 Install window trim centered over installed window Secure with 3 4 screws and 2 finishing nails as shown Do not screw into frame of window Snip off protruding...

Page 95: ...o vents in side walls as shown 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure with 1 2 screws 1 Your vents are now installed FINISH 16 x 8 x2 1 2 13 mm x12 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm 1 2 Screws 1 3 cm 1 2 Screws 1 3 cm 14 35 6 cm 6 15 2 cm 5 12 7 cm 7 8 17 8 20 3 cm Caulk Caulk ...

Page 96: ...tions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 OVERLAP Flush Flush Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer DRIP EDGE NOT INCLUDED Install drip edge over roof felt on gabl...

Page 97: ...cross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing...

Page 98: ...Roof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 Bend in roof 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Page 99: ... 5 to rain slot you must install another row of shingles 5 12 7 cm or less 5 12 7 cm MAX Top of rain slot Cut Off You have finished shingling your roof Proceed to capping the ridge FINISH Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut s...

Page 100: ...t Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED Flush 12 x12 12 x20 12 x16 12 x24 30 to 32 Pieces 51 to 53 Pieces 42 to 44 Pieces 60 to 62 Pieces ...

Page 101: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH Cut at top of rain slot Flush to shingles Trim cap off flush to shingles Cap 4 10 2 cm ...

Page 102: ... 8 NG 23 9 16 X 48 RIGHT FRONT GABLE K 48002309100 2 Front Rear Gable Panel Left 3 8 NG 23 9 16 X 48 LEFT FRONT GABLE K 48002309200 2 Corner Trim 3 8 NG 1 3 4 X 83 1 2 K 83080112000 8 Rearwall Panel A Side Panel SIDING 8 OC 4 X7 11506 9 Rear Panel B EZ 8 23 7 8 X 84 WALL PANEL J 84002314000 2 Frontwall Panel Right EZ 8 48 x 84 RIGHT FRONTWALL J 84004800101 1 Frontwall Panel Left EZ 8 48 x 84 LEFT ...

Page 103: ... siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent st...

Reviews: