
90
PARTS REQUIRED:
DOOR HARDWARE
3/8" (10,9 cm) Drill Bit
1/4" (0,6 cm) Drill Bit
1-1/2"
(3,8 cm)
Screws
SET
SCREW
Your spring bolt, T-handle and decorative hinges are now installed.
Attach inside handle and secure with set screw as shown.
5
6
Insert handle in hole and secure with 1-1/4" screws.
FINISH
RIGHT DOOR
1-3/4"
(4,4 cm)
TOP VIEW
1/4" Pre-drill and
3/8" Drill-through.
x1
x2
1-1/2" (3,8 cm)
Re-drill hole with 3/8 " drill.
Keep drilled hole square to
trim to avoid breaking edge
of door stiffener.
Measure and mark location of hole on outside of right door as shown
(Fig. A)
.
Pre-drill hole with 1/4" drill.
Fig. A
35-3/4"
(90 cm)
1-3/4"
(4,4 cm)