85
PARTS REQUIRED:
DOORS
Center doors on mark
(Fig. B).
Remove temporary supports and check to make sure doors open and close properly.
FINISH
Your doors are now installed.
Center 3/8" measurement
on mark.
3/8"
(1 cm)
Fig. B
3" (7,6 cm)
x12
Flush
against wall panels
Fig. A
OO
2
3
Screw hinge boards into wall supports with (10) 3" screws, as shown.
Make sure screws go into framing
.
4
Install
OO
flush under panels.
Secure to floor frame with (2) 3" screws
(Fig. A)
.
Mark center of door opening.
OO
x1
69" (175,3 cm) Door Stiffener
(5) 3" (7,6 cm)
Screws
in door stud
(2) 3" (7,6 cm) Screws
OO
TEMPORARY SUPPORT
TEMPORARY SUPPORT