29
1st 12' EAVE WALL INSTALLATION
3" (7,6 cm)
x1
3" (7,6 cm)
x12
2
BEGIN
Place 12' eave wall centered on floor.
1-1/2" (3,8 cm) overlap is to the top.
Secure wall with (1) 2" screw into 12' gable wall
bottom plate
(Fig. A)
and top plate
(Fig. B)
.
Secure wall to bottom plate first.
1
Nail lower edge of panels to floor with 2" nails
spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Nail panel to 12' wall stud with 1-1/2" nails
spaced 6" apart.
ENSURE PANEL CORNERS ARE FLUSH.
Your 1st 12' eave wall is now installed.
FINISH
2" (5,1 cm)
x27
1-1/2" (3,8 cm)
x13
2" (5,1 cm)
x2
PARTS REQUIRED
1-1/2" (3,8 cm)
Nails
2" (5,1 cm)
Nails
Flush
6" (15,2 cm)
6"
(15,2 cm)
2" (5,1 cm)
Screw
Fig. B
2" (5,1 cm)
Screw
Fig. A
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. C
Secure wall top plate with (1) 3" screw
angled at the corner at an angle as shown
(Fig. D)
.
3
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
1-1/2"
(3,8 cm)