8
3. INSTALLATION AND CONNECTION (continued)
3.3 Hydraulic connection
The unit is supplied with two 50 mm Ø union connections. Connect the water
inlet to the heat pump coming from the filtration group then connect the water
outlet to the heat pump at the water conduit going to the pool (see diagram
below).
Install a by-pass valve between the heat pump entrance and exit.
It is advised to install the unit on a dissociated cement block or a
mounting bracket designed for this use and to set up the unit on the
supplied rubber bushing (fastenings and washers not supplied).
The maximum installation distance between the unit and the swimming
pool is 15 metres.
The total length of the piping to and from the unit is 30 metres.
Insulate both the above ground and buried hydraulic piping.
The heat pump must be installed at a minimum distance from the pool
in compliance with NF C 15-100 (3.5 m from the water for France) or in
compliance with installation standards applicable in other countries.
Do not install the heat pump close to a heat source.
For installation in snowy regions we recommend sheltering the machine
to avoid snow accumulating on the evaporator.
If an automatic distributor or an electrolyser is used, it should be
installed imperatively after the heat pump with the goal of protecting the
titanium condenser against an elevated concentration of chemicals.
Be sure to install the by-pass valve and the supplied union connections
at the water inlet and outlet level in order to simplify purging during
the winter period and to facilitate access when disassembling for
maintenance.
Water inlet Ø 50 mm
Water outlet Ø 50 mm
Summary of Contents for Energyline Pro Inverter Series
Page 2: ......
Page 29: ...25 Page laissée blanche intentionnellement ...
Page 30: ...26 6 3 Vues éclatées et pièces détachées ENPI4M ENPI6M 6 ANNEXES suite ...
Page 63: ...25 Page left intentionally blank ...
Page 64: ...26 6 APPENDIX continued 6 3 Exploded view and spare parts ENPI4M ENPI6M ...
Page 97: ...25 Página en blanco intencionalmente ...
Page 98: ...26 6 ANEXOS continuación 6 3 Despiece y piezas de recambio ENPI4M ENPI6M ...
Page 131: ...25 Página deixada em branco intencionalmente ...
Page 132: ...26 6 ANEXOS continuação 6 3 Vistas explodidas e peças sobressalentes ENPI4M ENPI6M ...
Page 165: ...25 Seite bewusst leer gelassen ...
Page 166: ...26 6 ANHANG Fortsetzung 6 3 Explosionszeichnungen und Einzelteile ENPI4M ENPI6M ...
Page 173: ...ZWEMBAD WARMTEPOMP Installatie en bedieningshandleiding ENERGYLINE PRO iNVERTER ISENPINVR32 ...
Page 199: ...25 Opzettelijk leeg gelaten pagina ...
Page 200: ...26 6 BIJLAGEN vervolg 6 3 Opengewerkte tekeningen en onderdelen ENPI4M ENPI6M ...
Page 233: ...25 Pagina lasciata intenzionalmente bianca ...
Page 234: ...26 6 APPENDICI segue 6 3 Esplosi e parti di ricambio ENPI4M ENPI6M ...
Page 267: ...25 Denne siden er blank med hensikt ...
Page 268: ...26 6 VEDLEGG fortsetter 6 3 Sprengskisse og reservedeler ENPI4M ENPI6M ...
Page 301: ...25 Намеренно оставлено пустым ...
Page 302: ...26 6 ПРИЛОЖЕНИЯ продолжение 6 3 Вид в разборе и съемные элементы ENPI4M ENPI6M ...
Page 309: ......
Page 310: ......
Page 311: ......