Braking test procedure
MS0004
4 - Test procedure
The brake system is a significant component of the safety of the machine. The following tests must be performed
periodically
Section D - Inspection and maintenance schedule.
High speed :
• On a flat ground or slightly inclined (always lower than the authorized slope: see plate manufacturer).
• Trace on the ground, a line being used as reference mark of stop.
• Roll moving front until reaching maximum speed :
• Between 3 km/h (1.9 mph) and 6,5 km/h (4,039 mph) according to the machines.
• Release the manipulator as soon as the wheels axles are on the level of the traced reference mark.
• Stopped machine, measure the distance between the wheel axles and traced reference mark on the ground :
• If the distance lies between 0.2 m (0ft 8in) and 2,7 m (8 ft 11 in), the test is validated.
• If not, Contact HAULOTTE Services® to repair the system.
Summary of Contents for HT23RTJ O
Page 100: ...100 4001055250 E 10 21 USA GB General data Torque Values MS0005 Notes...
Page 112: ...112 4001055250 E 10 21 USA GB Chassis and turret Slew ring inspection MS0010 Notes...
Page 124: ...124 4001055250 E 10 21 USA GB Upper boom Check and replacing the pads MS0013 Notes...
Page 142: ...142 4001055250 E 10 21 USA GB Hydraulics Pressure adjustment MS0022 Notes...
Page 145: ...145 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 147: ...147 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 149: ...149 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 151: ...151 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 153: ...153 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Page 154: ...154 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Page 222: ...222 4001055250 E 10 21 USA GB Chassis and turret KUBOTA diesel engine MS0029 Notes...
Page 240: ...240 4001055250 E 10 21 USA GB Platform Weighing adjustment procedure calibration MS0164 Notes...
Page 248: ...248 4001055250 E 10 21 USA GB Jib Remove Re install jib cylinder MS0224 Notes...
Page 262: ...262 4001055250 E 10 21 USA GB Chassis Remove Replace wheel pivot and gear motor MS0225 Notes...
Page 268: ...268 4001055250 E 10 21 USA GB Platform Remove Replace load cell MS0226 Notes...
Page 286: ...286 4001055250 E 10 21 USA GB Upper boom Remove replace the telescope cylinder MS0227 Notes...
Page 314: ...314 4001055250 E 10 21 USA GB Upper boom Remove Replace the boom jib box assembly MS0230 Notes...
Page 324: ...324 4001055250 E 10 21 USA GB Upper boom Remove Replace the rear pads MS0231 Notes...
Page 366: ...366 4001055250 E 10 21 USA GB Chassis Wheel tightening procedure MP0001 Notes...
Page 370: ...370 4001055250 E 10 21 USA GB Chassis Wheel reducer level procedure MP0002 Notes...
Page 404: ...404 4001055250 E 10 21 USA GB Chassis Front axle locking function check MP0008 Notes...
Page 420: ...420 4001055250 E 10 21 USA GB Turntable Emptying the hydraulic tank MP0014 Notes...
Page 428: ...428 4001055250 E 10 21 USA GB Platform Checking the platform MP0017 Notes...
Page 436: ...436 4001055250 E 10 21 USA GB Turntable Emptying the diesel tank MP0020 Notes...
Page 444: ...444 4001055250 E 10 21 USA GB Turntable Starter battery inspection MP0023 Notes...
Page 474: ...474 4001055250 E 10 21 USA GB Turntable Check the tension of cables MP0035 Notes...
Page 484: ...484 4001055250 E 10 21 USA GB Turntable Draining the wheel reducer MP0043 Notes...