Upper boom
Boom adjustment procedure
MS0015
2 - On the front of the machine :
• Tight the chain until having a length of 20 mm +/- 1 mm. (From the lock-
nut to the extremity of the screw, see the following picture).
• Tight the lock-nut.
• Check that the 6 lock washers are present in the position shown on the
diagram.
3 - Raise the boom :
• Extend and retract totally the telescope :
• Lower the boom.
• Extend the telescoping boom between 100 and 200 mm.
• Loosen the lock-nut on the basket side.
4 - On the basket side :
• Tight the chain for having a length of 20 mm + 0 - 1 mm between the last
washer and the plan of the boom (See the following picture). .
5 - Extend the telescopic boom to 1 meter approximately :
• Retract the telescope totally.
• Extend the telescope between 100 and 200 mm.
• Check that the length of 20 mm is OK.
6 - If it's not, repeat the operations of the paragraphs 4 and 5 until the stabilization of the length to 20 mm :
• Lock the lock-nut when the length of 20 mm is OK.
Summary of Contents for HT23RTJ O
Page 100: ...100 4001055250 E 10 21 USA GB General data Torque Values MS0005 Notes...
Page 112: ...112 4001055250 E 10 21 USA GB Chassis and turret Slew ring inspection MS0010 Notes...
Page 124: ...124 4001055250 E 10 21 USA GB Upper boom Check and replacing the pads MS0013 Notes...
Page 142: ...142 4001055250 E 10 21 USA GB Hydraulics Pressure adjustment MS0022 Notes...
Page 145: ...145 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 147: ...147 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 149: ...149 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 151: ...151 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 153: ...153 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Page 154: ...154 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Page 222: ...222 4001055250 E 10 21 USA GB Chassis and turret KUBOTA diesel engine MS0029 Notes...
Page 240: ...240 4001055250 E 10 21 USA GB Platform Weighing adjustment procedure calibration MS0164 Notes...
Page 248: ...248 4001055250 E 10 21 USA GB Jib Remove Re install jib cylinder MS0224 Notes...
Page 262: ...262 4001055250 E 10 21 USA GB Chassis Remove Replace wheel pivot and gear motor MS0225 Notes...
Page 268: ...268 4001055250 E 10 21 USA GB Platform Remove Replace load cell MS0226 Notes...
Page 286: ...286 4001055250 E 10 21 USA GB Upper boom Remove replace the telescope cylinder MS0227 Notes...
Page 314: ...314 4001055250 E 10 21 USA GB Upper boom Remove Replace the boom jib box assembly MS0230 Notes...
Page 324: ...324 4001055250 E 10 21 USA GB Upper boom Remove Replace the rear pads MS0231 Notes...
Page 366: ...366 4001055250 E 10 21 USA GB Chassis Wheel tightening procedure MP0001 Notes...
Page 370: ...370 4001055250 E 10 21 USA GB Chassis Wheel reducer level procedure MP0002 Notes...
Page 404: ...404 4001055250 E 10 21 USA GB Chassis Front axle locking function check MP0008 Notes...
Page 420: ...420 4001055250 E 10 21 USA GB Turntable Emptying the hydraulic tank MP0014 Notes...
Page 428: ...428 4001055250 E 10 21 USA GB Platform Checking the platform MP0017 Notes...
Page 436: ...436 4001055250 E 10 21 USA GB Turntable Emptying the diesel tank MP0020 Notes...
Page 444: ...444 4001055250 E 10 21 USA GB Turntable Starter battery inspection MP0023 Notes...
Page 474: ...474 4001055250 E 10 21 USA GB Turntable Check the tension of cables MP0035 Notes...
Page 484: ...484 4001055250 E 10 21 USA GB Turntable Draining the wheel reducer MP0043 Notes...