175
4001055250
E 10.21
USA / GB
Upper boom
Procedure of dismantling / reassembling cage
MS0027
2.1 -
R
EMOVE
/
RE
-
INSTALL
THE
CONTROL
BOX
SUPPORT
AND
TOOL
TRAY
2.1.1 - Removal
• Open control box cover.
• Disconnect the main cables at their connectors either side of the control box (not shown).
• Unscrew and remove the 4 bolts / nuts ( A, B, C, D ) that fasten the control box to the ASB2.
• Unscrew and remove the 4 bolts / nuts ( E, F, G, H ) that fasten the ASB2 to the guard rails.
• The Control box support and tool tray can now be removed.
1.
Control box
2.
ASB2
3.
Guardrail
2.1.2 - Replace
• Re-installation is a reversal of the removal procedure.
• Before tightening all bolts and nuts, close the control box to check the alignment of the latch. If required,
loosen the latch bolts, close latch to align and re-tighten.
Summary of Contents for HT23RTJ O
Page 100: ...100 4001055250 E 10 21 USA GB General data Torque Values MS0005 Notes...
Page 112: ...112 4001055250 E 10 21 USA GB Chassis and turret Slew ring inspection MS0010 Notes...
Page 124: ...124 4001055250 E 10 21 USA GB Upper boom Check and replacing the pads MS0013 Notes...
Page 142: ...142 4001055250 E 10 21 USA GB Hydraulics Pressure adjustment MS0022 Notes...
Page 145: ...145 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 147: ...147 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 149: ...149 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 151: ...151 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 153: ...153 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Page 154: ...154 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Page 222: ...222 4001055250 E 10 21 USA GB Chassis and turret KUBOTA diesel engine MS0029 Notes...
Page 240: ...240 4001055250 E 10 21 USA GB Platform Weighing adjustment procedure calibration MS0164 Notes...
Page 248: ...248 4001055250 E 10 21 USA GB Jib Remove Re install jib cylinder MS0224 Notes...
Page 262: ...262 4001055250 E 10 21 USA GB Chassis Remove Replace wheel pivot and gear motor MS0225 Notes...
Page 268: ...268 4001055250 E 10 21 USA GB Platform Remove Replace load cell MS0226 Notes...
Page 286: ...286 4001055250 E 10 21 USA GB Upper boom Remove replace the telescope cylinder MS0227 Notes...
Page 314: ...314 4001055250 E 10 21 USA GB Upper boom Remove Replace the boom jib box assembly MS0230 Notes...
Page 324: ...324 4001055250 E 10 21 USA GB Upper boom Remove Replace the rear pads MS0231 Notes...
Page 366: ...366 4001055250 E 10 21 USA GB Chassis Wheel tightening procedure MP0001 Notes...
Page 370: ...370 4001055250 E 10 21 USA GB Chassis Wheel reducer level procedure MP0002 Notes...
Page 404: ...404 4001055250 E 10 21 USA GB Chassis Front axle locking function check MP0008 Notes...
Page 420: ...420 4001055250 E 10 21 USA GB Turntable Emptying the hydraulic tank MP0014 Notes...
Page 428: ...428 4001055250 E 10 21 USA GB Platform Checking the platform MP0017 Notes...
Page 436: ...436 4001055250 E 10 21 USA GB Turntable Emptying the diesel tank MP0020 Notes...
Page 444: ...444 4001055250 E 10 21 USA GB Turntable Starter battery inspection MP0023 Notes...
Page 474: ...474 4001055250 E 10 21 USA GB Turntable Check the tension of cables MP0035 Notes...
Page 484: ...484 4001055250 E 10 21 USA GB Turntable Draining the wheel reducer MP0043 Notes...