402
4001055250
E 10.21
USA / GB
Chassis
Front axle locking function check
MP0008
5 - Procedure
The front axles will oscillate when the boom is in transport
position (i.e. when the boom is less than 15° above horizontal
and not extended beyond 30cm (12in) on the machine and drive
is selected.
Ensure the axles are extended and the boom is fully retracted,
lowered, and centered betweeen the rear wheels prior to
beginning lockout cylinder test :
• Place a ramp 15 cm (6 in) high in front of the front right wheel.
• From platform control box, start engine.
• Place the drive control lever to the forward position and carefully drive
machine up ascension ramp until left front wheels is on top of block.
• Carefully extend the boom just enough to get it out of the transport
position.
• With boom in this position, place drive control lever to reverse and
carefully drive machine off of block and ramp.
• Have an assistant check to see that left front or right rear wheel remains
elevated in position off of the ground.
• Carefully return the boom to the transport position. When boom reaches
the transport position, carefully activate drive to release cylinders. To
lockout cylinders should release and allow the wheel to rest on ground.
This operation must be realized with extremes precautions by standing
strongly on the platform by the contact with the ground.
Summary of Contents for HT23RTJ O
Page 100: ...100 4001055250 E 10 21 USA GB General data Torque Values MS0005 Notes...
Page 112: ...112 4001055250 E 10 21 USA GB Chassis and turret Slew ring inspection MS0010 Notes...
Page 124: ...124 4001055250 E 10 21 USA GB Upper boom Check and replacing the pads MS0013 Notes...
Page 142: ...142 4001055250 E 10 21 USA GB Hydraulics Pressure adjustment MS0022 Notes...
Page 145: ...145 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 147: ...147 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 149: ...149 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 151: ...151 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Folio 2 2...
Page 153: ...153 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 7 Jib...
Page 154: ...154 4001055250 E 10 21 USA GB Hydraulics Hydraulic ways MS0023 Notes...
Page 222: ...222 4001055250 E 10 21 USA GB Chassis and turret KUBOTA diesel engine MS0029 Notes...
Page 240: ...240 4001055250 E 10 21 USA GB Platform Weighing adjustment procedure calibration MS0164 Notes...
Page 248: ...248 4001055250 E 10 21 USA GB Jib Remove Re install jib cylinder MS0224 Notes...
Page 262: ...262 4001055250 E 10 21 USA GB Chassis Remove Replace wheel pivot and gear motor MS0225 Notes...
Page 268: ...268 4001055250 E 10 21 USA GB Platform Remove Replace load cell MS0226 Notes...
Page 286: ...286 4001055250 E 10 21 USA GB Upper boom Remove replace the telescope cylinder MS0227 Notes...
Page 314: ...314 4001055250 E 10 21 USA GB Upper boom Remove Replace the boom jib box assembly MS0230 Notes...
Page 324: ...324 4001055250 E 10 21 USA GB Upper boom Remove Replace the rear pads MS0231 Notes...
Page 366: ...366 4001055250 E 10 21 USA GB Chassis Wheel tightening procedure MP0001 Notes...
Page 370: ...370 4001055250 E 10 21 USA GB Chassis Wheel reducer level procedure MP0002 Notes...
Page 404: ...404 4001055250 E 10 21 USA GB Chassis Front axle locking function check MP0008 Notes...
Page 420: ...420 4001055250 E 10 21 USA GB Turntable Emptying the hydraulic tank MP0014 Notes...
Page 428: ...428 4001055250 E 10 21 USA GB Platform Checking the platform MP0017 Notes...
Page 436: ...436 4001055250 E 10 21 USA GB Turntable Emptying the diesel tank MP0020 Notes...
Page 444: ...444 4001055250 E 10 21 USA GB Turntable Starter battery inspection MP0023 Notes...
Page 474: ...474 4001055250 E 10 21 USA GB Turntable Check the tension of cables MP0035 Notes...
Page 484: ...484 4001055250 E 10 21 USA GB Turntable Draining the wheel reducer MP0043 Notes...