3.3.3. Electric Heater Insulation Resistance
When performing the final inspection of the electri-
cal installations, a “leakage” may be detected when
measuring the heater’s insulation resistance. The
reason for this is that the insulating material of the
heating elements has absorbed moisture from the
air (storage, transport). After operating the heater
for a few times, the moisture will be removed from
the heating elements.
Do not connect the power feed for the heater
through the RCD (residual current device)!
3.4. Installing the Heater
See figure 10.
1. Connect cables to the heater ( 3.3.).
2. Place the heater and adjust the heater vertically
straight using the adjustable legs.
3. Use fixing kits (2 pcs) to fix the heater to
sauna’s structures.
möglich vom Ofen entfernt einzulassen, um es vor
Spritzwasser zu schützen.
3.3.3. Isolationswiderstand des Elektrosaunaofens
Bei der Endkontrolle der Elektroinstallationen kann
bei der Messung des Isolationswiderstandes ein
“Leck” auftreten, was darauf zurückzuführen ist,
dass Luftfeuchtigkeit in das Isolationsmaterial der
Heizwiderstände eingetreten ist (bei Lagerung und
Transport). Die Feuchtigkeit entweicht aus den Wi-
derständen nach zwei Erwärmungen.
Schalten Sie den Netzstrom des Elektrosauna-
ofens nicht über den Fehlerstromschalter ein!
3.4. Installation des Saunaofens
Siehe Abb. 10.
1. Verbinden Sie die Kabel mit dem Ofen ( 3.3.).
2. Richten Sie den Ofen mit den verstellbaren
Füßen lotrecht aus.
3. Bringen Sie den Ofen mit Befestigungssätzen (2
Stück) an der Saunakonstruktion an.
3.
PCXE/-E
3.
PCHXE/-HE
3.3.
1.
2.
Figure 10. Installing the heater
Abbildung 10. Installation des Saunaofens