26
FIG 20- 2
4) Place a hose clamp on both sides of the shut off valve on the hose, Put the hose clamps over the bolts sticking
out of the intake hopper, Using a 1/4" nut, tighten
FIG 20- 3
5) Locate the 540" hose, Clamp long hydraulic hose onto the side of the auger, using the hose clamps place them
on the hydraulic hose and slip them on the bolts already on the auger.
6) Leave a little slack in the hydraulic hose between the bolts, Loop the hydraulic hose to the inside of the bottom
scissor lift bracket.
7) Pull hose all the way through the bracket.
Installation of cable brackets
STEP 21
1) When installing the brackets for the cables put in the ½ cable clamps, one in the short bracket and the tall
ones,(FIG 21-1,21-2) and the mast will take two,(FIG 21-4) the outriggers(FIG21-3)will take one also but they
can be installed when you run that cable
2) it will be easier to install them before you bolt the up to the tubes but make sure not to tighten them so you
can feed the cable thought
FIG 21- 1
“P” clamp
SHORT TRUSS
Summary of Contents for H1392
Page 27: ...27 FIG 21 2 FIG 21 3 FIG 21 4 TALL TRUSS OUTRIGGERS CENTER TRUSS ...
Page 31: ...31 FIG 23 8 FIG 23 9 FIG 23 10 ...
Page 45: ...45 ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 ...
Page 49: ...49 ...
Page 50: ...50 ...
Page 51: ...51 ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 54: ...54 ...
Page 55: ...55 ...
Page 56: ...56 ...
Page 57: ...57 ...
Page 58: ...58 ...
Page 59: ...59 ...
Page 60: ...60 ...
Page 61: ...61 ...
Page 62: ...62 ...
Page 63: ...63 ...
Page 64: ...64 ...
Page 65: ...65 ...
Page 66: ...66 ...