35
INSTALLATION (Options)
Only For Qualified Installers
Blower Box
Blower
Assembly
Box Cover
Register
Install blower box between wall studs as shown. Run 3”
x 10” duct to blower box and secure. Do not use the wall
cavity as a duct.
Run wires to blower as shown in wiring diagram on page 42.
Mount blower assembly in box as shown. Test blower.
Note: Blower will not run until fireplace is hot.
Mount blower cover as shown .
Install and finish drywall as desired.
Mount register after drywall and painting are finished.
Install wall mounting brackets to side of blower box with
three screws.
Wall Mounting Brackets
Blower Cover
Summary of Contents for The Serenity III HB 38 DV
Page 27: ...VENTING Only For Qualified Installers 27...
Page 54: ......