General infomation about the eCB1
Note
To prevent confusion between the different models, please refer to the version of the
device marked on the packeging. The installation and configuration should be carried
out in the specified order.
Meaning of the LED states
Status-LED
•
permanent green
The eCB1 is ready for operation.
•
Slowly flashing in green
The device starts.
•
Quickly flashing in green
A firmware update is running.
•
glowing or flashing in red or
An error occured.
orange
Network-LED
•
Off
no connection
•
permanent green
connection active
•
green flashing
network activity
Bus-LED
•
O
ff
device is not configured
•
green
connection is ok
•
orange
no device detected
•
red
BUS error
Reset funktion
You can reset the eCB1 to network settings or simply restart the device by pressing the
reset button. The time period of pressure applied is important.
Reset to factory settings
With a pointy object, press the
reset button
for 4 to 10 seconds.
Restart the eCB1
To restart, use a pointy object to press the
reset button
for 1 to 3 seconds.
Setup of direct LAN connection to the eCB1
Configuration instructions
eCB1
smartmeter
Version: 1.2.3
4